Further details regarding the individual steps
B
C
A
close
open
Commissioning, inspection, maintenance
(cont.)
4. Open shut-off valves A and (if instal-
led) B.
5. Connect fill hose to valve C and
open valve C.
6. Fill heating system. (Minimum sys-
tem pressure > 0.8 bar).
7. Close valve C.
21