Fitting the boiler and assembling connections
Connection, safety valve and condensate drain
A
Filling the siphon with water
Installation sequence
(cont.)
Connect condensate drain pipe A with
a constant fall and a pipe vent to the
public sewage system.
Observe the local waste water regula-
tions.
Note
Fill the siphon with water before com-
missioning.
Fill a minimum of 0.3 l of water into the
flue gas connection.
!
Please note
At commissioning, flue gas may
be emitted from the condensate
drain.
Fill the siphon with water before
commissioning.
13