1 About this document

Target group
Product Manager
Project Manager
Project engineer
Installation personnel
Commissioning personnel
Maintenance personnel
Building Technologies
Fire Safety
Goal and purpose
This document contains information about planning and installing the pipe system
for the following Siemens aspirating smoke detectors:
FDA241
FDA221
You will find information about installing, configuring and commissioning the
detector in the technical manual for the aspirating smoke detector. See the chapter
'Applicable documents [
Target groups
The information in this document is intended for the following target groups:
Activity
Is responsible for information
passing between the manufacturer
and regional company.
Coordinates the flow of information
between the individual groups of
people involved in a project.
Coordinates the deployment of all
persons and resources involved in
the project according to schedule.
Provides the information required to
run the project.
Sets parameters for product
depending on specific national
and/or customer requirements.
Checks operability and approves
the product for commissioning at the
place of installation.
Is responsible for troubleshooting.
Assembles and installs the product
components at the place of
installation.
Carries out a performance check
following installation.
Configure the product at the place
of installation according to
customer-specific requirements.
Check the product operability and
release the product for use by the
operator.
Searches for and corrects
malfunctions.
Carries out all maintenance work.
Checks that the products are in
perfect working order.
Searches for and corrects
malfunctions.
7]'.
Qualification
Has obtained suitable specialist
training for the function and for the
products.
Has attended the training courses
for Product Managers.
Has obtained suitable specialist
training for the function and for the
products.
Has attended the training courses
for Project Managers.
Has obtained suitable specialist
training for the function and for the
products.
Has attended the training courses
for Product Engineer.
Has received specialist training in
the area of building installation
technology or electrical installations.
Has obtained suitable specialist
training for the function and for the
products.
Has attended the training courses
for commissioning personnel.
Has obtained suitable specialist
training for the function and for the
products.
About this document
1
Technical terms
5 | 56
A6V10334435_g_en_--
2017-09-12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fda221

Table of Contents