Connecting The Oview Programmer - Nice WIDE S Instructions And Warnings For Installation And Use

Electromechanical road barrier
Table of Contents

Advertisement

4.
house the battery (C)
5.
close the part (B) securing it to the catch (A)
49
6.
connect the battery to the dedicated terminal
50
7.
close the box on the control unit and re-attach it to the hous-
ing.

9.3 CONNECTING THE OVIEW PROGRAMMER

The "Oview" programming unit can be connected to the control
unit.
This unit allows for rapidly and fully programming the functions, ad-
justing the parameters, updating the control unit firmware, running
the diagnostics to detect any malfunctions and performing routine
maintenance.
The "Oview" allows for operating on the control unit at a maximum
distance of roughly 100 m. If several control units are networked
with each other in a "BusT4" network, by connecting the "Oview"
to one of these units, it is possible to view on the display all the
networked control units (up to a maximum 16 units).
The "Oview" unit can also be left connected to the control unit
during normal operation of the automation, so that the user can
send commands using a specific menu.
a
Before connecting the IBT4N interface, it is neces-
sary to disconnect the control unit from the power
supply.
30 – ENGLISH
To install the interface:
1.
remove the upper cover (A) of the boom gate cubicle
2.
slide out the rear panel first towards the other and then out-
wards
51
C
3.
place the interface (B) in the appropriate slot (C) on the con-
trol unit's electronic board
4.
insert the cable (D) in the appropriate slot (E) on the interface.
52
At this stage, the control unit can be powered again.
l
For further information, consult the specific manu-
als of the connected devices.
A
D
E
B
C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wide lWide m

Table of Contents