ZALMAN Z7 Manual page 10

Atx mid tower
Table of Contents

Advertisement

Z7 Plus / Z7
(4) Graphics Card Installation
Click
Tip
▶ The PCI Slot can also be secured with Bolts.
(5) 5.25" and 3.5" Drive Installation
1) Front Cover Removal
PULL
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z7 plus

Table of Contents