9) Product design and specifications may be revised to improve quality and performance. Disclaimer) Zalman Tech Co., Ltd. is not responsible for any damages due to external causes, including but not limited to, improper use, problems with electrical power, accident, neglect,...
Z11 Series Installation (1) Side Panel Removal ② ① (2) Motherboard Installation There are 4 Stand Offs preinstalled. Please refer to the diagrams below for additional Stand Off positions (based on motherboard type). ATX Board m-ATX Board Stand-Off B Bolt...
Z11 Series ② Attach Drive to Tray A. 3.5” FDD Installation B. 3.5” HDD Installation Bolt B Bolt A C. 2.5” SSD Installation Bolt B (4) Front Cover Installation When removing the front cover, the power switch and extension cable are separated to prevent disconnection. Be sure to connect them before installing the front cover.
Z11 Series (5) 3.5” HDD Installation Bolt D HDD Anti- vibration rubber When transporting an assembled When removing HDD, pull the fastening system, please secure the HDD with lever outwards and then remove it. Bolt E as shown above. Bolt E (6) Cable Connection Power Button Fan Connection...
USB 2.0 X 2 USB 3.0 USB 3.0 Reset HDD LED ※USB 3.0 is only supported in Z11 Plus / MotherBoard Z11 PLUS HF1 ※ Power and I / O ports to connect please refer to your motherboard. manual. ※ Product design and specifications may be revised to improve quality and performance.
Page 10
Zalman Tech Co., Ltd. #1007 daeryung Techno Town III, 448 Gasan-dong, Gumchun-gu, Seoul, 153-803,Korea Tel: +82-2-2107-3232 / Fax: +82-2-2107-3322 / www.zalman.com / e-mail: zalman@zalman.com Zalman USA, Inc. 13825 Norton Ave Building #12 Chino, CA91710...