Close the duct and fix the ceiling
seal with one saw (not supplied) or
with the double adhesive face which
is on the ceiling joint.
After testing the pump as described
in chapter 5, close the lid of the hull
and position the duct elbow.
ceiling joint

4. OPERATION :

Pour water into air conditioner drain tank. Check that the pump starts then
stops when the water level has gone back down. To check the operation of
the alarm, continue to pour in water until the alarm triggers (cutting of the air
conditioner or generating an audible or visual alarm, etc.).
5. CLEANING :
Periodically: at the beginning of the season. Clean the detection unit.
Disconnect from mains supply before opening. Remove the lid of the elbow
to reach the detection block. Remove the float, clean the detection unit and
the float using a solution of water containing 5% bleach. Replace the float in
this initial position (magnet faced down), reinstall the lid. Carry out an
operating test on the pump and the alarm. When the air conditioner is
installed in an area liable to cause or favour extensive dirtying of the
condensate water, maintain more frequently.
Eckerle Industrie-Elektronik GmbH, Otto-Eckerle-Strasse 12A, D – 76316 Malsch/Germany
Tel +49 (0)7246-9204-0 Fax +49 (0)7246-9204-44
www.eckerle.com
info@eckerle.com
- 21 -

Advertisement

Table of Contents
loading

Table of Contents