Baxi Ecogen 24/1.0 Installation & Servicing Instructions Manual page 93

Gas fired wall mounted condensing boiler and power generator
Table of Contents

Advertisement

* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme. A Building
Regulations Compliance Certificate will then be issued to the customer. [1] May be required to claim grants and feed in tariff.
© Heating and Hotwater Industry Council (HHIC)
page 98
Service Record
It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed.
Service Provider
Before completing the appropriate Service Interval Record below, please ensure you have carried out the service as described in the manufacturer's instructions.
Always use the manufacturer's specified spare part when replacing controls.

Advertisement

Table of Contents
loading

Table of Contents