Baxi Ecogen 24/1.0 Installation & Servicing Instructions Manual page 4

Gas fired wall mounted condensing boiler and power generator
Table of Contents

Advertisement

BS EN 12828
Heating systems in buildings.
BS EN 14336
Installation & commissioning of water based heating systems.
BS 6798
Installation of gas fired hot water boilers.
BS 5440 Part 1 Flues.
BS 5440 Part 2 Ventilation.
BS 7074
Expansion vessels and ancillary equipment for sealed water systems.
BS 7593
Treatment of water in domestic hot water central heating systems.
In IE the following Codes of Practice apply:
Standard
Scope
I.S. 813
Domestic Gas Installations.
The following standards give valuable additional information;
BS 5546
Installation of hot water supplies for domestic purposes.
BS EN 12828
Heating systems in buildings.
BS EN 14336
Installation & commissioning of water based heating systems.
BS 7074
Expansion vessels and ancillary equipment for sealed water systems.
BS 7593
Treatment of water in domestic hot water central heating systems.
BS 7671
Requirements for electrical installations
BS 50438
Requirement for the connection of microgenerators in parallel with public low­voltage distribution networks.
IMPORTANT ­ Installation, Commissioning, Service & Repair
This appliance must be installed in accordance with the manufacturer's instructions and the regulations in force. Read the instructions fully before installing or using
the appliance.
In GB, this must be carried out by a competent person as stated in the Gas Safety (Installation & Use) Regulations and Part P of the Electrical Regulations.
Definition of competence: A person who works for a Gas Safe registered company and holding current certificates in the relevant ACS modules, is deemed competent.
In IE, this must be carried out by a competent person as stated in I.S. 813 "Domestic Gas Installations".
The addition of anything that may interfere with the normal operation of the appliance without express written permission from the manufacturer or his agent could invalidate the
appliance warranty. In GB this could also infringe the Gas Safety (Installation and Use) Regulations.
Warning ­ Check the information on the data plate is compatible with local supply conditions.
All Gas Safe registered engineers carry an ID card with their licence number and a photograph. You can check your engineer is registered by telephoning 0800 408 5500 or online
at www.gassaferegister.co.uk
Type test for purpose of Regulation 5 certified by:
Notified Body 0087.
Product/Production certified by:
Notified Body 0086.
For GB/IE only.
page 4
Safe Manual Handling
General
The following advice should be adhered to, from when first handling the boiler to the final stages of installation, and also during maintenance.
Most injuries as a result of inappropriate handling and lifting are to the back, but all other parts of the body are vulnerable, particularly shoulders, arms and hands.
Health & Safety is the responsibility of EVERYONE.
There is no 'safe' limit for one man ­ each person has different capabilities. The boiler should be handled and lifted using a suitable lifting device. A sack truck is ideal for
manoeuvring the appliance to the room where the installation is to take place.
Do not handle or lift unless you feel physically able.
Wear appropriate Personal Protection Equipment e.g. protective gloves, safety footwear etc.
Preparation
Co­ordinate movements ­ know where, and when, you are all going.
Minimise the number of times needed to move the boiler ­ plan ahead.
Always ensure when handling or lifting the route is clear and unobstructed. If possible avoid steps, wet or slippery surfaces, unlit areas etc. and take special care on ladders/into
lofts.
Technique
When handling or lifting always use safe techniques ­ keep your back straight, bend your knees. Don't twist ­ move your feet, avoid bending forwards and sideways and keep the
load as close to your body as possible.
Where possible transport and manoeuvre the appliance into the installation site (pack weight 120 kg) using a sack truck. Keep the appliance as upright as possible at all times,
see note below.
Always grip the boiler firmly, and before lifting feel where the weight is concentrated to establish the centre of gravity, repositioning yourself as necessary. See the 'Installation'
section of these instructions for recommended lift points.
Remember
The circumstances of each installation are different. Always asses the risks associated with handling and lifting according to the individual conditions.
If at any time when installing the boiler you feel that you may have injured yourself STOP !!
DO NOT 'work through' the pain ­ you may cause further injury.
NOTE: The appliance must be transported at all times in the upright position. The appliance must not be laid on its back / side / front.

Advertisement

Table of Contents
loading

Table of Contents