Installing The Ip Gw Blade; Step One: Install The Ip Gw Blade Into The Mse 8000 Chassis - TANDBERG MSE 8350 Getting Started Manual

Tandberg codian ip gateway getting started guide
Table of Contents

Advertisement

Installing the IP GW blade

Before installing the IP GW blade into the MSE 8000, read the Safety
Information guide that accompanied the MSE 8000 chassis.
Although blades are hot-swappable parts, you must only remove one
!
blade at any time. Remove the power from the MSE 8000, if you need to
remove more than one blade at a time.
Before hot-swapping a blade, shut down the blade using the web interface.
!
Do not shut down a blade during a software upgrade or if the blade is
processing (for example if a call is taking place).
For information about powering the MSE 8000, refer to the Getting Started Guide
that accompanied the chassis.

Step one: Install the IP GW blade into the MSE 8000 chassis

You must install either a blade or a blanking blade in each of the ten
!
positions in the chassis.
The Supervisor blade must be installed into slot 1 of the MSE 8000
!
chassis.
1
Remove the blade or blanking blade from the slot into which you are going to
install the IP GW blade:
i
Using a No.1 Phillips screwdriver, loosen the screws in the retaining latches
with an anti-clockwise quarter turn.
ii
Open both retaining latches on the front of the blade or blanking blade.
When open, a retaining latch is at a 90
the blade.
iii Slide out the blade or blanking blade.
2
Open both retaining latches on the front of the IP GW blade. When open, a
retaining latch is at a 90
3
Slide the IP GW blade into the blade slot (as shown in Figure 2) until it stops.
4
Simultaneously close both retaining latches on the blade (thereby engaging the
connectors at the rear of the blade) to secure in the chassis as shown in Figure 3.
4
angle perpendicular to the front of the blade.
°
angle perpendicular to the front of
°

Advertisement

Table of Contents
loading

Table of Contents