Contents Safety notes Unit description Installation instructions Gas connection Commissioning Shutdown Care and maintenance Troubleshooting Intended use Customer service and guarantee Environmental protection and recycling Electrical wiring diagram PGT 30/60 Electrical wiring diagram PGT 100 Exploded view of PGT 30 Spare parts list for PGT 30 Exploded view of PGT 60 Spare parts list for PGT 60...
REMKO PGT Safety notes Unit description Always observe the respective local building code and fire prevention The units are mobile fan-assisted air heaters (WLE) directly fired guidelines as well as the guidelines of the accident prevention and insurance associations when using the units.
Installation instructions Operating sequence A manual reset of the STB can only The safety regulations of be implemented after the units the accident prevention Moving the operating switch have cooled down. and insurance associations, to the “I” position puts the respective regional building CAUTION the supply air fan into operation regulations and the combustion...
REMKO PGT Gas connection The gas connection / unit The fresh air supply required The use of longer hose lines ■ ■ operation must take place for trouble-free combustion is permissible if: exclusively on the basis of must be ensured. It is practical...
Page 7
Connecting the gas supply Assembly note Icing up of gas cylinders 1. Connect pressure With insufficiently dimensioned During the assembly controller to gas supply systems, there is a risk or disassembly of the gas hose, the gas cylinder of the pressurised gas cylinder it is necessary to counter-hold or gas supply icing up.
REMKO PGT Commissioning Tank gas systems The units should be checked for Connecting the units visible defects on the operating to the electrical power supply When connecting the units to tank and safety devices as well as gas systems, ensure sufficient pipe proper installation and correct 1.
Page 9
Heating without room Setting and controlling Heating with room thermostat thermostat the heating capacity (Accessories) The units operate in continuous The desired or required heating The units operate fully operation without room capacity can be steplessly set automatically and according temperature regulation.
REMKO PGT Shutdown Care and maintenance Ventilate 1. Close the shut off valve(s) of NOTE the gas supply system and allow Regular care and maintenance, In this operating mode, the supply the gas flame to burn out. at the latest after every air fan runs permanently.
Page 11
14. Adjust the ignition and ionisation Check the inlet and outlet grille Disassembling and cleaning ■ electrode in accordance for contamination on a regular the gas burner with the sketch and tighten basis 1. Switch off the gas supply to the clamping screw 4 of the unit and unplug the power the electrode bracket.
"certificate of environment. on the basis of their structural guarantee" to REMKO GmbH & Our units are carefully packed design and equipment. Co. KG at the time when the units and delivered in sturdy transport The unit definition is “commercial...
REMKO PGT Electrical wiring diagram PGT 30 / PGT 60 PGT 30/60-R07 Legend: = Ionisation electrode = Terminal block = Fan motor = Solenoid valve = Relay socket = Thermostat socket = Operating switch STB = Safety temperature limiter = Ignition electrode = Ignition transformer We reserve the right to modify the dimensions and design as part of the ongoing technical development process.
Electrical wiring diagram PGT 100 PGT 100-R07 Legend: = Auxiliary relay = Ionisation electrode = Terminal block = Fan motor = Solenoid valve = Aftercooler thermostat = Relay socket = Thermostat socket STB = Safety temperature limiter = Operating switch = Ignition electrode = Ignition transformer We reserve the right to modify the dimensions and design as part of the ongoing technical development process.
REMKO PGT Exploded view of PGT 100 11 a/b We reserve the right to modify the dimensions and design as part of the ongoing technical development process.
Technical data Series PGT 30 (E) PGT 60 (E) PGT 100 (E) Max. nominal heating capacity Heating capacity, adjustable 10 to 26 25 to 55 50 to 100 Air volume 1450 3600 Fuel / gas type Liquid gas cat I 3B/P Unit connection pressure Unit connection value...
Page 24
REMKO, a partner who helps to solve problems. Sales REMKO offers not just a well- established sales network both nationally and internationally, but also has exceptionally highly- qualified sales specialists. REMKO employees in the...
Need help?
Do you have a question about the PGT Series and is the answer not in the manual?
Questions and answers