progressive automations FLT-05 User Manual page 7

Hide thumbs Also See for FLT-05:
Table of Contents

Advertisement

Assembly
STEP 6
Lock in the position of the Center Rails (7) using eight
M6x10 Machine Screws (13) as shown in the image below.
STEP 7
Attach each Foot (6) with four M6x14 Machine Screws (14)
and tighten them in a cross-pattern.
STEP 8
We recommend having at least two people for this
step. Grab the base (the legs) of the assembled frame
and turn it right side up.
STEP 9
Plug the Power Cord (17) into a 110V outlet and plug
in all three cables from the Legs into the Control Box.
Use the two Cables (16) for the two farthest legs. It is
now ready for use.
IMPORTANT
Prior to normal operation, please complete a Reset
Procedure outlined in the next section.
6

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FLT-05 and is the answer not in the manual?

Questions and answers

Table of Contents