Commissioning And Operation - Klarstein 10033689 Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 25
EN
32

COMMISSIONING AND OPERATION

Universal 5 L beer keg
1. Before piercing the plug on the top
of the keg, you must always follow
the instructions marked on the keg to
eliminate the excess gas and ensure that
the keg has rested long enough to avoid
foam coming out through the tap faucet.
2. Uprightly direct the piercing pin against
the sealant on the upper center of
the keg (maybe you need to tear off
the marking ring or change a proper
sealant), press the piercing pin/keg
lifter to poke the sealant and then push
the piercing pin all immerse in the keg
quickly. To assemble the tap mechanism
until you hear a "Ka" sound that will
indicate the tap mechanism fixes on the
beer keg (shown as figure 5).
Beer dispensing unit
Keg seal
Beer keg
Figure 5

Advertisement

Table of Contents
loading

Table of Contents