Page 1
CAUTION! WARNING! Indicates cautionary information. EYE PROTECTION Eye protection must be worn while operating or working near the MHSU. READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE USING THE MHSU. MS-12-37 Revision 2 12-02-CP...
Page 2
Safety Precautions Setup 1. Remove the retaining ring from the hydraulic housing of the MHSU body by using the Use safety glasses when setting up and retaining ring pliers. operating the MHSU. Use caution when releasing the retaining ring from the pliers.
Page 3
2. Install the Swagelok nut and ferrules onto the Recommended Minimum Wall Thickness of die head in the order and orientation shown Tubing for Use with the MHSU table on page until finger-tight and all die threads are covered 4. Use of tubing below the recommended by the nut.
MANUFACTURER SPECIFICALLY DISAVOWS ANY OTHER REPRESENTATION, EXPRESS OR IMPLIED, WARRANTY, OR LIABILITY RELATING TO THE CONDITION OF USE OF THE PRODUCT, AND IN NO EVENT SHALL SWAGELOK BE LIABLE TO PURCHASE, OR ANY THIRD PARTY, FOR ANY DIRECT OR INDIRECT CONSEQUENTIAL OR INCIDENTAL DAMAGES.
Need help?
Do you have a question about the MHSU and is the answer not in the manual?
Questions and answers