Preparing for installation
Clearance dimensions
700
Fig. 1
Delivery and handling
The boiler is delivered on a wooden pallet.
The following components are delivered in individual
packages:
■
Casing and thermal insulation; see Fig. 3
■
MatriX cylinder burner
■
Control unit
Cable set
■
Programming module
■
Programming unit
■
■
Set with technical documentation
■
Venturi extension; required accessory for burners
from 200 kW and open flue operation
B
Fig. 2
1000
A
1. Remove the bag and place to one side.
The bag contains the following:
Boiler flue connection
■
■
Flue gas temperature sensor
■
Retaining bracket
■
Trap
2. Position the ramp against the pallet.
3. Remove the transport brackets.
4. Roll the boiler down the ramp backwards in a
straight line.
Danger
The boiler can cause serious injury if it over-
turns.
At least 2 people are required to move the
boiler. Roll the boiler in a straight line.
Alternative transport aids
Lifting eye (from 120 kW)
A
4 holes to slide poles (to be provided by the cus-
B
tomer) through as a transport aid
7