Connection Configuration #2; 120 Vac Connections For Denali, Dover, Tacoma Models (North America 60 Hz) - Sundance Spas Spas 680 Series Manual

Sundance hot tub pre-delivery guide
Table of Contents

Advertisement

Connection Configuration #2

120 vAC Connections for denali, dover, Tacoma Models
(North America 60 Hz)
If the supplied
10 ft GFCI power cord
(US only) cannot reach a
dedicated, grounded wall
outlet, it is necessary to
install a 3-wire,
hard-wired connection.
These diagrams illustrate
that configuration.
For enhanced heater
performance the use of a
4-wire power connection is
necessary.
A pressure sensitive
terminal block (bonding
lug) is attached to the
outside surface of the
load box. This permits the
connection of a bonding
wire between this point
and any metal equipment
chassis, metal water
pipe, or metal conduit
within 5 ft (1.5m) of the
spa. The bonding wire
must be at least a #8
²
AWG (8.4 mm
) solid
copper wire.
24
1-Pole Circuit Breaker with 3-Wire Grounded Load Connection
(3 Wires to Hot Tub, 1-Hot (L), 1-Neutral (N), 1-Ground)
120 VAC
White (N)
Black (L)
Main
Service
Black (L)
Panel
White (N)
with
GFCI
Pigtail
Neutral Bus
Ground
Main Panel with Secondary GFCI Shut-Off Box Using a
1-Pole GFCI Breaker with 3-Wire Grounded Connection
(3 Wires to Hot Tub, 1-Hot (L), 1-Neutral (N), 1-Ground)
Main Panel*
Black (L)
White (N)
Green (Ground)
*GFCI Sub Panel commonly
used when recommended GFCI
does not install in Main Panel.
1-Pole
GFCI
TB1
Breaker
W
B
TB2
Ground/Bonding Lug**
Green
Load Neutral Lug on Breaker
Note: service disconnect not
shown in this diagram.
The control box TB1 terminal
position varies between models.
GFCI Sub Panel*
1-Pole
GFCI
W
Breaker
Black (L)
White (N)
Green
Load Neutral Lug on Breaker
Pigtail
Note: service disconnect not
Neutral Bus
shown in this diagram.
Ground
The control box TB1 terminal
position varies between models.
TB1
B
TB2
Ground/Bonding Lug**

Advertisement

Table of Contents
loading

Table of Contents