CO-Series with Mortice Installation Instructions Right Hand Shown, Left Hand Opposite Tools Included Please refer to Legge 990 Mortice instructions for installation of the mortice lock Prepare Door If Insulator S trip is Present, Carefully R emoveit See template.
Page 2
Check Lever Handing Install Cylinder and Lever See "Rehanding" on back page if pin is not towards latch Keyed Lever Interchangeable Cores Until Cam Stops Align as Shown 90˚ ˚ 15°...
Page 3
Prepare Legge 990 Mortice Lock for installation. Install Outside Spindle and Standoffs Please refer to Legge 990 Mortice Lock installation guide for more details (in lock box). " Wrench Slide Mortice Lock Into Door Install Bushing and Outside Escutcheon Align Triangles...
Page 4
Install Plate and Spindle Align as Shown For door thickness >42mm For door thickness 35mm - 42mm...
Page 5
Route Wires and Install Inside Escutcheon Office (40) or Privacy (50) Functions 40 / 50 Ribbon Cable Test Mechanical Function a. Rotate lever down and verify that latch retracts fully Classroom/Storeroom (70) Function Battery Cable Release lever and verify that latch extends fully...
Page 6
Install Battery Holder and Strap Follow Steps Below if 40 or 50 Function Only If 70 Function, Go to Step 22 IMPORTANT - when installing the battery pack, the plug for the pack must be on the right. Install Ribbon Cable IMPORTANT - the red wire must be on the left.
Page 7
Changing the Cylinder’s Tailpiece Cap Pin (2 Positions) Prepare Frame Classic Wood Everest or Primus Metal 2 Notches from Full Install Strike Future Lever Removal After Installing the Lock, See the User Guide for Setup and Operation.
Page 8
Rehanding Remove Spring Cage, Align Arrow with Latch, and Reinstall Use Loctite Remove Reader and Cover From Baseplate Reinstall Cover and Reader onto Baseplate NOTE: On Keypad Only Applications, Reader is Not Removable! Allegion (Australia) Pty Ltd Allegion (New Zealand) Limited Phone 1 8 0 0 0 9 8 09 4 Phone 08 00 47 7 8 69 12/2013...