DIRECT EXHAUST — Sidewall
Sidewall direct exhaust termination
Determine termination location
1. The vent termination must be installed as shown in Figure 27 and
in Figure 29, page 34.
2. The termination placement must comply with clearances and
limitations shown in Figure 26, page 32.
3. Locate the termination so is not likely to be damaged by foreign
objects, such as stones or balls, or subject to buildup of leaves or
sediment.
4. Ensure proper clearance above grade or snow line. Keep vents/
air intake area clear of accumulating snow.
5. Install the boiler in a location that allows proper routing of all vent
piping from the boiler vent connection to the selected sidewall
location.
Multiple vent terminations
1. When terminating multiple SlimFit boilers, terminate each vent
connection as described in this manual. See Figure 28, page 34
for typical layout.
2. Place wall penetrations to obtain minimum clearances shown in
Figure 27 for U. S. installations.
3. For Canadian installations, provide clearances required by Natural
Gas and Propane Installation Code - CAN/CSA B149.1 Installa-
tion Code and a ULC S636 compliant vent kit.
Part number 550-100-180/0917
COMMERCIAL CONDENSING GAS
-
— Boiler Manual
FIRED WATER BOILER
listed in
Read and follow all instructions in this
manual.
through
Locate the termination such that the total
vent piping from the boiler to the termi-
nation
turer's instructions.
Provide a vent manufacturer's SlimFit Vent
Adapter and reducer (if needed) at the boiler
vent connection.
Every joint on
ing
supply locking collars could result in vent/
air piping leakage.
Install vent piping
See
clamp on page 24. Verify that the seal is installed cor-
rectly before inserting the vent manufacturer's SlimFit
Vent Adapter.
USE SWEEP ELBOWS FOR ALL VENT PIPING
WHEN POSSIBLE — Short-radius elbows cause
higher pressure loss, resulting in less allowable
vent/air piping length. See Figure 24, page 29
for maximum lengths and reductions required
for fittings.
1. Install the vent manufacturer's SlimFit Vent Adapter in the boiler
vent outlet. Follow all vent manufacturer instructions.
2. Install a vent manufacturer reducer if needed to adapt to the vent
size being used.
3. Slope vent piping toward the boiler — slope vent piping a mini-
mum of ¼ inch per foot in horizontal runs or larger per vent pipe
manufacturer's instructions.
4. Support piping independently of the boiler — Install pipe sup-
ports every 5 feet on both the horizontal and vertical runs. Install
a hanger support within 6 inches of any upturn in the piping. Or
follow vent pipe manufacturer's instructions.
Install vent termination elbow
1. Maintain the required dimensions of the finished termination
piping as shown in Figure 27, page 33.
.
.
include a locking collar. Failure to
about boiler vent/air outlet seals and
-
.
-
-