Weil-McLain 2 Series Manual page 11

Commercial condensing gas-fired water boilers
Hide thumbs Also See for 2 Series:

Advertisement

®
SlimFit
Series 2
Prepare boiler
Cold weather handling
in a very cold location (below 32°F) before installation,
handle with care until the pl
room temperature.
the boiler or cause bodily injury while lift ing and
handling.
not lift or handle the boiler by the water or gas pipes.
Do not push on or apply weight to the pipes. Severe
damage can be done to the boiler.
Leave the
fl anges and on the boiler vent and air adapters until
ready to att ach piping. Th is will protect the fl anges
surfaces from damage and prevent debris from falling
into the vent or air adapter.
Uncrating the boiler
Do not drop the boiler. Damage to boiler components
can result. Leave the boiler on the crate pallet until
ready to place in fi nal location. Follow all uncrating
instructions.
Failure to comply could result in severe personal injury,
death or substantial property damage.
SlimFit boiler on pallet, with ramp in position
Apply pressure only to jacket
corners when moving
Pallet
Part number 550-100-180/0917
COMMERCIAL CONDENSING GAS
(continued)
— If boiler has been stored
astic components come to
. Use caution not to drop
— Do
on the supply and return
Brackets
-
— Boiler Manual
FIRED WATER BOILER
1. See Figure 7 for the following.
2. Move the crate to a solid, level surface.
3. Th ere must be room at the piping end to place the ramp and roll
the boiler down off the crate pallet.
4. Make sure the crate is sitt ing securely.
5. Remove outer cardboard covering.
6. Remove the ramp from the crate and place the end of the ramp
into the notch in the pallet as shown in Figure 7 .
7. Follow the uncrating instruction label to secure the ramp to the
pallet.
8. Remove the sheet metal screws and lag bolts from the six shipping
brackets. Remove and discard the shipping brackets. Re-insert the
upper screws into the holes in the boiler frame for best appearance.
Moving/handling the boiler
DO NOT
use the piping or other extensions to manipu-
late the boiler.
Failure to comply could damage the boiler heat ex-
changer or other components.
Sheet metal
screws
Lag bolts
.
Ramp