Lpg Fuel; Related Documents; Conversion And Commissioning Procedure - Lochinvar CP-M Series Installation, Commissioning & Maintenance Instructions

High efficiency gas fired condensing boilers
Table of Contents

Advertisement

15.0

LPG FUEL

NOTE! IT IS STRONGLY RECOMMENDED THAT, ON LPG INSTALLATIONS, GAS DETECTION EQUIPMENT
IS FITTED. THIS EQUIPMENT SHOULD BE POSITIONED NEAR THE APPLIANCE AND AT LOW LEVEL. IT
IS ALSO IMPORTANT THAT THE SPACE HOUSING THE APPLIANCE IS ADEQUATELY VENTILATED AT
HIGH AND LOW LEVEL. THIS APPLIANCE MUST NOT BE LOCATED BELOW GROUND E.G. IN A CELLAR
15.1

RELATED DOCUMENTS

In addition to those documents listed in Section 4.1: RELATED DOCUMENTS within the main body of the
installer's guide the gas installation should also comply with the guidance offered in the following documents.
BS 5482-1: 2005
Part 1:
The operation of the CP-M+ range on LPG-Propane (3
2H and the design and installation details described in the main body of the installer's guide should be followed.
15.2

CONVERSION AND COMMISSIONING PROCEDURE

This process must be carried out in the order stated when the boiler is switched on for the first time. Failure to
follow the following procedure may lead to non-warrantable damage to the boiler.
TABLE 15.2
Due to the design of the boiler, the conversion to LPG-Propane requires adjustment of the gas valve(s) only (see
Figure 15.1). The sequence is as follows:
1.
Turn screw 2 (Figure 15.1) clockwise until fully closed. On models with two gas valves, this should be
done to both valves.
2.
Turn screw 2 counter clockwise in accordance with Table 15.1. On models with two gas valves, this
should be done to both valves.
Code of practice for domestic butane and propane gas burning installations.
Installations at permanent dwellings, residential park homes and commercial
premises, with installation pipework sizes not exceeding dn25 for steel and dn28 for
corrugated stainless steel or copper.
Number of Turns Open
Boiler
Type
CP-M+60
CP-M+80
CP-M+100
CP-M+120
CP-M+150
CP-M+180
* Both gas valves must be opened this number of turns
TABLE 15.1
PRE-ADJUSTMENT OF GAS VALVES
Boiler
"p-out" Pressure at Gas Valve
Type
CP-M+120
CP-M+150
CP-M+180
PRESSURE ADJUSTMENT OF LEFT GAS VALVE
boiler type
load
max. load 10.3 (± 0.3)
CP-M+60-120
2
min. load
max. load 10.4 (± 0.3)
CP-M+ 150
2
min. load
max. load 10.5 (± 0.3)
CP-M+ 180
2
min. load
Cf. EN437
1
All values are measured without boiler door.
2
TABLE 15.3
COMBUSTION GAS READINGS
Family) 3P is similar to that on Natural Gas (2
rd
(Counterclockwise)
Propane G31
0.5
0.75
1.5
*1
*1
*2.25
Propane G31
-4 to -2 Pa
-7 to -5 Pa
-7 to -5 Pa
G31
1
CO
(%)
CO
(%)
2
2
10.3 (± 0.3)
9.3 (± 0.3)
9.3 (± 0.3)
10.4 (± 0.3)
9.3 (± 0.3)
9.3 (± 0.3)
10.5 (± 0.3)
9.3 (± 0.3)
9.3 (± 0.3)
Family)
nd
75

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp-m+120Cp-m+150Cp-m+60Cp-m+80Cp-m+180Cp-m+100

Table of Contents