Removal and replacement procedures
Required tools
You need the following items for some procedures:
•
T-10 Torx screwdriver
•
T-15 Torx screwdriver
•
HP Insight Diagnostics software
Preparation procedures
To access some components and perform certain service procedures, you must perform one or more of the
following procedures:
•
Power down the nodes
If you must remove the chassis from a rack or a non-hot-plug component from the chassis or node, then
you must power down the nodes.
•
Remove the nodes from the chassis
If the rack environment, cabling configuration, or the chassis location in the rack creates unstable
conditions, then remove the node from the chassis.
•
Remove the access panel (on page 23).
•
Install the access panel (on page 23).
Power down the node
Before powering down the node for any upgrade or maintenance procedures, perform a backup of critical
server data and programs.
IMPORTANT:
system.
To power down the node, use one of the following methods:
•
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the node enters standby
mode.
•
Press and hold the Power On/Standby button for more than 4 seconds to force the node to enter
standby mode.
This method forces the node to enter standby mode without properly exiting applications and the OS.
If an application stops responding, you can use this method to force a shutdown.
•
Use a virtual power button selection through iLO.
("HP Insight
("Power down the
node" on page 21).
("Remove a node from the
When the node is in standby mode, auxiliary power is still being provided to the
Diagnostics" on page 47)
chassis" on page 22).
Removal and replacement procedures 21