2. Installation procedure 【Applicable model : Group C】
1
①M-NET board
Terminal block
2
Position hole
Hole for M-NET
④Terminal base
ground
3
5
Connection of M-NET board (CN5) and Control board (CNMNT)
Terminal block
⑫Lead wire-D
7
Connection of M-NET board (CN2M) and
Terminal block (Terminals A & B)
E-214
M-NET Converter PAC-SF81MA-E
Address switches
Control board
⑤Screw
(M4×8)
A B S
Mounting hole
⑦Screw (M3×20)
⑥Terminal block (M-NET)
⑧Label
Hole for M-NET ground
⑩Lead wire-B
Right side of
electric box
CNVMNT
CNMNT
CN5
Control board
① M-NET
board
CN2M
CND
CENTRALIZED CONTROL(M-NET)
A
B
S
⑪Lead wire-C
6
Connection of M-NET board (CND) and
Control board (CNVMVT)
1
Install the M-NET board ① so that the
(SW11, SW12) come front.
※Put it securely until it sounds click.
2
Install the Terminal block (M-NET) ⑥ on
the Terminal base ④.
※The Terminal base ④ has round boss
for positioning.
Match the round boss to the holes of
the Terminal base ④.
3
Put the Label ⑧ on the Terminal base ④
.
※Not to close the Hole for M-NET
ground.
Install the Terminal base ④ on the
4
bottom inside of the electric box.
4
5
Connect the lead wire-B ⑩ to both the
connector CN5 on the M-NET board ①
and the connector CNMNT on the
control board.
※Caution
Wire Marking:NON-INV, Connector
color:White Always make sure that the
markings and the applicable model match.
If used incorrectly, parts could be
damaged.
6
Connect the lead wire-C ⑪ to both the
connector CND on the M-NET board ①
and the connector CNVMNT on the
control board.
7
Connect the lead wire-D ⑫ to both the
connector CN2M on the M-NET board
① and the terminals A & B on the
terminal block (M-NET) ⑥.
8
The lead wires should be tied together
with the other lead wires with
the pull tight ⑭ not to loose.
Wiring length is adjusted according to
apparatus.
It progresses to the xx page
3.Wiring method for M-NET
Note1:Use ground wire and screw ⑬ as
required to connect the shield of
M-NET transmission line to the unit.
Note2:Take great care that no lead wire is
caught on anything when instaling
panels.