Electronics International UBG-16 Installation Instructions Manual page 3

Table of Contents

Advertisement

P-110 Standard EGT Probe
Impor
Impor
tant Installation Inf
tant Installation Inf
Impor
Impor tant Installation Inf
Impor
tant Installation Inf
tant Installation Inf ormation
All steps
All steps
All steps
All steps
All steps must
must
must
must be read before installing a probe.
must
2. Do Not Overtighten.
Over time, tight wire wraps
will cause the wire to break.
3. Both clip rings must be on the
inside of the hose clamp.
The rubber band is used to hold
the washer on during shipping.
4. The Type-K thermocouple wire's yellow and red insulation must
be stripped 3/8" for proper overlap in the OLC-1 (Over-Lap Con-
nector). Back out the set screw, insert wires into opposite ends
(matching colors) so wire insulation is just inside the nylon housing
and the ends of the wires are not exposed on the opposite side.
Tighten the set screw until the set screw stops turning and the hex
driver starts to flex (4-5 in-lbs). Tug on the wires (1-2 lbs) to
insure proper connection.
be read before installing a probe.
be read before installing a probe.
be read before installing a probe.
be read before installing a probe.
1. Leave slack in the cable to allow
for engine movement and vibration.
ormation
ormation
ormation
ormation
S.S. Washer.
Hose Clamp.
Drill 13/64" Hole
(See II Manual)
1218121

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents