Shw145-435Ce - Lochinvar EcoShield SHW60-325CE Installation, Commissioning And Maintenance Instructions

High efficiency gas fired condensing water heaters
Hide thumbs Also See for EcoShield SHW60-325CE:
Table of Contents

Advertisement

FIGURE 14.2
14.2.3

SHW145-435CE

1.
Remove the top and front access covers from the unit.
2.
Remove the gas valve and manifold from the unit via the unions on each end (Figure 14.3).
3.
Remove the three screws mounting the injector plate on the air shroud (Figure 14.3).
4.
Remove the four screws securing the manifold adapter to the injector plate taking care not to damage
the O-ring.
5.
Locate the propane orifice disk from the conversion kit bag. Verify that the stamping on the orifice disk
is correct for the water heater (see Table 14.1 LPG Orifice Markings).
6.
Remove the existing orifice from the O-ring in the side of the injector plate and replace it with the orifice
from the kit. Position and secure the orifice in the injector plate as shown in Figure 14.3.
7.
Reposition the manifold adapter to the injector plate and replace the four manifold adapter mounting
screws. Handle the O-ring with care, do not damage.
8.
Reposition the injector plate to the air shroud and replace the three injector plate mounting screws.
9.
After installation is complete, attach the propane conversion label (in the conversion kit bag) next to the
water heater rating plate. Attach the LP caution label (in the conversion kit bag) to the left side of the
unit in the lower left corner.
10.
Replace the top and front access covers.
FIGURE 14.3
CONVERSION PROCEDURE SHW115-435CE
CONVERSION PROCEDURE SHW145-435CE