Advertisement

WARNING:
If the information in this
manual is not followed exactly, a fire or
explosion may result causing property damage,
personal injury or loss of life.
-- This storage tank MUST NOT be installed in
any location where gasoline or flammable vapors
are likely to be present.
-- WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance.
• Do not touch any electric switch; do not use any
phone in your building.
• Immediately call your gas supplier from a near by
phone. Follow the gas supplier's instructions.
• If you cannot reach your gas supplier, call the fire
department.
• Installation and service must be performed by a
qualified installer, service agency, or the gas
supplier.
LOW LEAD CONTENT
Installation & Operation Manual
Models: 60 - 119
The information contained in
WARNING
this manual is intended for use by
qualified professional installers, or
service technicians. Consult your
local expert for proper installation
or service procedures.
Save this manual for future reference.
SJS-I-O Rev D
®

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Lock Temp SJS060 and is the answer not in the manual?

Questions and answers

Summary of Contents for Lochinvar Lock Temp SJS060

  • Page 1 SJS-I-O Rev D ® Installation & Operation Manual Models: 60 - 119 WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life. -- This storage tank MUST NOT be installed in any location where gasoline or flammable vapors are likely to be present.
  • Page 2: Table Of Contents

    Contents CONTENTS ................ 2 Mixing valve ..............6 HAZARD DEFINITIONS ............. 2 Aquastat / bulbwell ............6 1. GENERAL INFORMATION ........3-4 Piping the relief valve ............ 7 Operating Restrictions ..........4 Drain ................7 2. INSTALLATION ............. 5 Completing the installation ........... 7 Pre-Installation ..............
  • Page 3: General Information

    Less than 5 seconds 145°F Less than 3 seconds 150°F About 1 1/2 seconds 155°F About 1 second Figure 1-1 Lochinvar SJS Series Storage Tank HOT WATER OUTLET 23° 23° SENSOR WELL FROM WATER HEATER TO WATER HEATER DRAIN VALVE...
  • Page 4: Operating Restrictions

    Storage Tanks are pre-engineered and pre-assembled complete of slope), capable of supporting the total weight of the unit with all fittings. And like every Lochinvar product, they are when filled to capacity. thoroughly tested to ensure proper performance from the The unit should be mounted to the floor following applicable moment they are installed.
  • Page 5: Installation

    If any evidence of damage is detected that ordinances. Installations in Canada must conform to could affect the safe operation of the unit, contact Lochinvar B149.2 Installation Code. , LLC., or your authorized sales representative, to report the damage and to receive instructions on how to proceed.
  • Page 6: Connecting The Hot Water Source

    Figure 2-1_Vertical Tank Piping Diagram installed in the 3/8" diameter dry bulbwell supplied with all Lochinvar Hot Water Storage Tanks. The equipment may employ a water sensing thermistor. The thermistor would be installed into the dry bulbwell and wired back to the hot water equipment.
  • Page 7: Piping The Relief Valve

    Piping the relief valve (Relief valve is field supplied) All Lochinvar SJS Storage Tanks are equipped with a relief valve tapping on the tank. The valve should be piped to a discharge line leading to a suitable drain. Piping the pressure relief valve...
  • Page 8: Operation

    ® Installation and Operation Manual Operation Shutdown procedure After all installation procedures have been completed, and all water piping to the energy source and power connections have been double checked, the unit is ready for operation. Turn off all power to the circulating pump and the hot The following Startup Procedure focuses on the storage tank.
  • Page 9: Inspection

    ® Installation and Operation Manual Inspection The following table summarizes the recommended time intervals for inspections of the tank, components, water piping and power connections. RECOMMENDED INSPECTIONS Time Interval To Be Inspected Manufacturer Weekly Monthly Quarterly Annually Specs  Circulating Pump Gauges - Pressure &...
  • Page 10: Maintenance

    ® Installation and Operation Manual Maintenance A new tank installation should have a regular inspection program set up. The first inspection should be within the first three months of operation. Once the tendency to accumulate sediment has been established, the inspection program can be modified to suit the water conditions.
  • Page 11 ® Installation and Operation Manual Notes...
  • Page 12: Revision Notes

    Revision Notes: Revision A (ECO #C11841) initial release. Revision B (ECO C11908) reflects the update of chart information in FIG. 1-1 on page 3 for SJS080. Revision C (ECO #C12382) reflects the addition of the CSA Low Lead Content logo. Revision D (ECO C15671) reflects the addition of the “Locating the tank”...

This manual is also suitable for:

Lock temp sjs080Lock temp sjs119

Table of Contents