SAFETY INSTRUCTIONS OPTIFLEX 1100 C Warnings and symbols used DANGER! This information refers to the immediate danger when working with electricity. DANGER! These warnings must be observed without fail. Even partial disregard of this warning can lead to serious health problems and even death. There is also the risk of seriously damaging the device or parts of the operator's plant.
INSTALLATION OPTIFLEX 1100 C 2.1 Ø2 mm / 0.08¨ single cable probe (liquid applications) 2.1.1 Scope of delivery INFORMATION! Do a check of the packing list to make sure that you have all the elements given in the order. Figure 2-1: Scope of delivery: device with Ø2 mm single cable probe option...
Page 5
INSTALLATION OPTIFLEX 1100 C INFORMATION! The single cable probe measures between the top of the counterweight and the thread stop on the process connection. • Measure the probe. Make sure that you include the length of the counterweight (m) minus the cable insertion length (n).
INSTALLATION OPTIFLEX 1100 C 2.2 Coaxial probe (low-viscosity liquid applications) 2.2.1 Scope of delivery INFORMATION! Do a check of the packing list to make sure that you have all the elements given in the order. Figure 2-4: Scope of delivery: device with coaxial probe option 1 Converter, process connection and signal cable 2 HC M6×5 screws (1 screw per segment of tube, 3 screws for the last segment - supplied in a plastic sachet)
INSTALLATION OPTIFLEX 1100 C 2.2.2 How to assemble the segmented coaxial probe Attach the tube segments Figure 2-5: How to assemble the segmented coaxial probe: part 1 1 Top segment of tube 2 Bottom segment of tube 3 1 HC M6×5 lock screw...
Page 8
INSTALLATION OPTIFLEX 1100 C Adjust the probe length to the tank height Figure 2-6: How to assemble the segmented coaxial probe: part 2 a = Delivered probe length (with all segments attached, but without the probe end cap) b = Length of tube needed = total probe length, L - 15 mm / 0.6¨...
Page 9
INSTALLATION OPTIFLEX 1100 C Adjust the probe length to the tank height Figure 2-7: How to assemble the segmented coaxial probe 1 Coaxial probe: Last segment of the tube 2 Probe end cap 3 1 HC M6×5 lock screw 4 Bonded plastic spacer...
Page 10
INSTALLATION OPTIFLEX 1100 C Make sure that the tension in the signal cable is correct Figure 2-8: How to assemble the segmented coaxial probe: part 4 1 Coaxial probe: Signal cable 2 Coaxial probe: Probe end cap 3 2 HC M6×5 screws •...
INSTALLATION OPTIFLEX 1100 C 2.3 Ø4 mm / 0.15¨ single cable probe (solid applications) 2.3.1 Scope of delivery INFORMATION! Do a check of the packing list to make sure that you have all the elements given in the order. Figure 2-10: Scope of delivery: device with Ø4 mm single cable probe option...
INSTALLATION OPTIFLEX 1100 C 2.3.2 How to assemble a single cable probe Attach the probe to the converter Figure 2-11: How to assemble the Ø4 mm / 0.15¨ single cable probe: part 1 1 Converter and process connection 2 Probe...
Page 13
INSTALLATION OPTIFLEX 1100 C Adjust the probe length to the tank height Figure 2-12: How to assemble the Ø4 mm / 0.15¨ single cable probe: part 2 L = Probe length (thread stop to the bottom of the counterweight m = Counterweight length = 100 mm / 4¨...
INSTALLATION OPTIFLEX 1100 C 2.4 How to install a device with a threaded connection Equipment needed: • Gasket (not supplied with G (ISO 228) threaded connections) • 34 mm wrench (not supplied) 2.5 How to turn or remove the signal converter...
ELECTRICAL CONNECTIONS OPTIFLEX 1100 C 3.1 Electrical installation: 2-wire, loop-powered Open the terminal compartment cover Figure 3-1: How to open the terminal compartment cover • Turn the cover counterclockwise with a strap wrench. • Remove the cover. Connect the device to the electrical circuit...
OPERATION OPTIFLEX 1100 C 4.1 General notes For more data about device configuration, refer to the handbook. 4.2 Digital display screen (option) Display screen Figure 4-1: Default screen 1 Current output percentage (bar graph and text - only shown if the output function is the same as the measurement...
Page 17
OPERATION OPTIFLEX 1100 C Procedure Screen Steps Description • [> > > > ] 3 times. Default screen. Enter configuration mode. • [> > > > ] YES - to start the quick set-up procedure, or [ ] NO - to go back to the menu.
Page 19
NOTES OPTIFLEX 1100 C 01/2012 - 4001226201 - QS OPTIFLEX 1100 R01 en www.krohne.com...
Page 20
Measuring systems for the oil and gas industry • Measuring systems for sea-going tankers Head Office KROHNE Messtechnik GmbH Ludwig-Krohne-Str. 5 D-47058 Duisburg (Germany) Tel.:+49 (0)203 301 0 Fax:+49 (0)203 301 10389 info@krohne.de The current list of all KROHNE contacts and addresses can be found at: www.krohne.com...