5.3.3

Inspecting the installed unit

Procedure
1. Mark the attachment points "A" for the wall support at the desired position
with the help of a spirit level. Then, drill holes diameter: 8 mm, depth:
40 mm.
2. Insert the supplied plastic plugs, and fix the wall support to the wall with
the screws supplied. Before thightening the screws adjust wall support
horizontally using a spirit level.
3. Unlock the screw(s) of the front panel(s) (steam side), then remove the
front panel(s).
4. Unmount the steam cylinder(s) (see Nordmann AT4 operating instruc­
tions chapter 6.3.1).
5. Hang up the unit onto the wall support. Then, fix the unit to the wall
support using the supplied screws "B".
6. Remount the steam cylinder(s) (see Nordmann AT4 operating instruc­
tions chapter 6.3.1).
7. Reattach the front panel(s) and secure it with the screw(s).
Check the following points:
Is the unit installed in the correct place (see chapter 5.3.1)?
Is the supporting surface stable enough?
Is the unit correctly aligned, vertically and horizontally?
Is the unit properly secured (see chapter 5.3.2)?
Has/have the front panel(s) of the unit been relocated and correctly fixed
with the screw(s)?