Gas Train Connections - Unigas TP90A Installation, User's, And Maintenance Manual

Table of Contents

Advertisement

GAS TRAIN CONNECTIONS

The diagrams show the components of the gas trai included in the delivery and which must be fitted by the installer.The diagrams are in
compliance with the current laws.
ATTENTION: BEFORE EXECUTING THE CONNECTIONS TO THE GAS PIPE NETWORK, BE SURE THAT THE MANUAL
SHUTOFF COCKS ARE CLOSED.
Gas train - 1
Gas train with valves group VGD 20/40 with built-in gas pressure governor + VPS504 gas proving system
1
Gas train - 2 (Rp2)
Gas train with valves group MBC 1200SE(2 valves + gas filter + pressure governor + pressure switch) + VPS504 gas proving
system
1
Gas train 3(DN65/80/100)
Gas train with valves group MBC 1900/3100/5000SE (2 valves + gas filter + pressure governor + pressure switch) + VPS504
gas proving system
1
Key
1
Burner
2
Butterfly valve
3
Gas proving system
4
Low gas pressure switch
5
High gas pressure switch (optional)
6
Gas filter
7
Bellow joint
8
Manual cock
11
VGD valves group
18
MBC valves group (2", provided with filter)
19
MBC valves group (DN65/80/100)
CIB UNIGAS - M039177CA
4
10
2
3
18
2
3
19
2
3
MANUFACTURER
5
6
MANUFACTURER
4
5
MANUFACTURER
4
5
6
16
INSTALLER
7
8
INSTALLER
7
8
INSTALLER
7
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tp91aTp512aTp515aTp520aTp92aTp525a ... Show all

Table of Contents