• Identify whether underground cables and pipes are present before preparing the site or anchoring the Thank you for purchasing this GrowSpan™ greenhouse. structure. When properly assembled and maintained, this product will provide years of reliable service. These instructions include •...
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ REQUIRED TOOLS ASSEMBLY PROCEDURE The following list identifies the main tools needed to Following the instructions as presented will help ensure assemble the shelter. Additional tools and supports may be the proper assembly of your greenhouse. Failing to follow...
Page 4
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ SPECIAL NOTE: Baseboards for Frame These instructions describe installing a baseboard Space below is reserved for customer notes. (recommended) at ground level along each side of the frame. The baseboard runs from the front to the back of the frame.
Page 5
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ The following graphics and photos will help you identify the different parts and show you how they are used. (Some parts are not shown.) FA4482B QH1404 Band Clamp Tek Screw FAH320B & FALB32B 102921 FAH009B &...
Page 6
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ GrowSpan Round Premium ™ Corrugated Greenhouses OVERVIEW This section describes assembling your greenhouse. For details, please see section, Assembling the Round ATTENTION: Position purlins evenly during the Premium Greenhouse Components. See illustration below frame assembly. Use the rafter pipe joints as to identify main parts of greenhouse.
Page 7
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ LAY OUT THE BUILDING SITE 3. Use a transit or line level to drive the second corner post to the same depth as the first ground post. After the site is prepared, lay out the building site.
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ ASSEMBLING THE ROUND PREMIUM GREENHOUSE 2. Slide four (4) end purlin clamps (two on each side of FRAME COMPONENTS the peak) over the rafter pipes. Position all end clamps at the rafter pipe joints. Position the end clamps as After the site is prepared and an inventory of parts is shown.
Page 9
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ RAFTER ASSEMBLY (continued) INTERIOR RAFTER ASSEMBLY Space below is reserved for customer notes. Complete the following steps for the interior rafters. 1. Select the pipes for the first interior rafter assembly and position these on the ground as shown.
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ ASSEMBLE THE FRAME 2. Secure the leg pipes to the ground posts using the 5/16" x 2 1/2" machine bolts and nuts. Complete these steps to assemble the frame. Rafter Gather the parts: •...
Page 11
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ FRAME ASSEMBLY (continued) 9. Move to the interior rafter and verify that the rafter spacing is forty-eight inches (48") on-center (adjust as 5. As the second rafter is steadied, take one 131S075 needed) and tighten the cross connector.
Page 12
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ FRAME ASSEMBLY (continued) BASEBOARD INSTALLATION (RECOMMENDED) 17. Tighten the cross connector bolts and secure each Gather the parts: purlin pipe joint with a Tek screw. • Treated or recycled plastic lumber (supplied by 18. Secure the cross connector to the rafter and the purlin customer).
Page 13
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ SIDE STRUT INSTALLATION 3. Attach the remaining end of the strut to the baseboard using a lag screw or nut and bolt (not included). See There are four (4) side struts for the shelter. These struts the diagram that follows for location.
Page 14
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ END WALL INSTALLATION • DO NOT REPOSITION THE END WALL VERTICALS USED AT THE SEAM OF TWO (2) POLYCARBONATE The steps to install the end walls for the greenhouse PANELS. include the following: •...
Page 15
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ END WALL INSTALLATION (continued) 9. Measure the distance between the top of the base tube and band clamp (Step 7) to determine the length of the 4. Secure the base tube between the legs of the end first vertical section of the door frame tube.
Page 16
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ INSTALL THE END WALL FRAME (continued) 17. Using a level (or other means), verify that one vertical door frame tube is plumb and tighten the band clamp 15. Using the marks on the base tube for the rough bolt to lock the first door frame member in place.
Page 17
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ INSTALL THE END WALL FRAME (continued) 27. With the square-to-round tube connect bracket attached to the top of the frame member, place a 22. Use the end frame diagram to determine the number of square tube fitting on the bottom of the frame member.
Page 18
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ INSTALL SLIDING DOOR STAY ROLLER 1. Locate the 100356 stay roller box and remove the bracket, roller, bushings, bolt, and nuts from package. 2. Looking at the rough door opening of the assembled end wall, secure the stay roller bracket in the lower-left corner of the door opening as shown below.
Page 19
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ INSTALL THE BACK END WALL FRAME The end wall framing for the back of the greenhouse is assembled in the same way as the front end wall. If the back wall includes the optional double door kit, repeat the End Wall Installation procedure and install the framing for the remaining end wall.
Page 20
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ END PANEL INSTALLATION 4. Install a Tek screw and washer to hold the panel and foam seal in place. The following procedure describes one way to install the end panels. This procedure installs the panels so the ATTENTION: DO NOT install the screw near the top of corrugated ribs run horizontally.
Page 21
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ END PANEL INSTALLATION (continued) The gray bars in the photo below represent the 7. Choose the next 12' 2" panel and overlap the top edge horizontal ribs of the corrugated panels. The dashed of the bottom panel with the bottom edge of the top line represents the edge of the roof panel that is panel.
Page 22
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ INSTALL THE CORRUGATED ROOF PANELS The corrugated roof panels are attached to the tops of each 2. Place the panel at the desired height above the ground rafter using Tek screws and washers. These panels are and on top of the end rafter.
Page 23
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ INSTALL CORRUGATED ROOF PANELS (continued) 8. Return to the first seam where two panels overlap and cut a section of poly-latch U-Channel (102197) so that 6. Repeat the steps to install the lower two 8' 2" panels it fits between the rafters.
Page 24
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ INSTALL CORRUGATED ROOF PANELS (continued) Space below is reserved for customer notes. 10. Continue installing the corrugated polycarbonate roof panels and securing the overlap seams until all roof panels are installed. 11. Verify that all panels are properly secured and continue with the ASSEMBLE AND INSTALL SLIDING DOORS procedure.
Page 25
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ ASSEMBLE AND INSTALL SLIDING DOORS — OVERVIEW The general steps to install the sliding doors are as follows: 1. Assemble the 102923 door frames. 2. Attach bearing hangers to the door frames. 3. Attach the sliding door track to the end wall.
Page 26
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ ATTACH SLIDING DOOR TRACK TO END WALL Complete these steps: 1. Using the diagram below, mark the bracket bolt locations for the 100380 track brackets. NOTE: Brackets to be level across the end frame.
Page 27
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ INSTALL SLIDING DOORS 5. After tightening the mounting bolts, slide three (3) track mounting brackets onto one door track (100377). Complete the following steps to attach the sliding door track 6. With assistance, lift track and align brackets with the brackets to the end wall frame.
Page 28
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ INSTALL AND ADJUST SLIDING DOORS Complete these steps: Space below is reserved for customer notes. 1. With assistance, carefully lift one door into position and slide bearing hangers into the end of the door track.
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ INSTALL DOOR CLADDING AND HANDLES 2. After panel installation, slide doors back into the door track (if needed) and install the 104548 profile along Complete these steps: the end wall door frame as shown in the following 1.
Page 30
GrowSpan™ offers several items that can be used to alleviate 5. Return to the door track mounting bolts and cut bolts to a condensation condition.
Page 31
GROWSPAN ROUND PREMIUM CORRUGATED GREENHOUSES ™ 12'-6 5/8" Height QUICK START GUIDE 30' Round Premium Greenhouse 30'-0" Width FRONT Grid Represents 12" Squares Ground Level Frame shown may differ in length from actual frame. Revision date: 05.01.19...
Need help?
Do you have a question about the 106265 and is the answer not in the manual?
Questions and answers