Cooling Or Continuous Airflow; Check Safety Controls - Carrier 58CU0A Series Installation, Start-Up, Operating And Service And Maintenance Instructions

4-way multipoise, ultra low nox communicating, 80% afue gas furnace input capacities: 40,000 thru 100,000 btuh
Table of Contents

Advertisement

Model Size
3T-040
4T-060
5T-080
5T-100
Model Size
3T-040
4T-060
5T-080
5T-100
Model Size
3T-040
4T-060
5T-080
5T-100
Model Size
3T-040
4T-060
5T-080
5T-100
(1.) Default A/C airflow when A/C switches are in OFF position
(2.) Default continuous fan airflow when CF switches are in OFF position
(3.) Switch positions are also shown on furnace wiring diagram

Check Safety Controls

1. Check Main Limit Switch(es)
This control shuts off combustion control system and en-
ergizes air- -circulating blower motor, if furnace overheats.
By using this method to check limit control, it can be es-
tablished that limit is functioning properly and will operate
if there is a restricted duct system or motor failure. If limit
control does not function during this test, cause must be
determined and corrected.
a. Run furnace for at least 5 minutes.
b. Gradually block off return air with a piece of cardboard
or sheet metal until the limit trips.
c. Unblock return air to permit normal circulation.
d. Burners will re- -light when furnace cools down.
2. Check draft safeguard switch.
The purpose of this control is to cause the safe shutdown
of the furnace during certain blocked vent conditions.
a. Verify vent pipe is cool to the touch.
BASED ON 350 CFM/TON (SETUP SWITCH SW1---5 OFF, SW4---3 OFF)
DEF
525
DEF
525
DEF
700
DEF
700
BASED ON 400 CFM/TON (SETUP SWITCH SW1---5 ON, SW4---3 OFF)
DEF
600
DEF
600
DEF
800
DEF
800
BASED ON 325 CFM/TON (SETUP SWITCH SW1---5 OFF, SW4---3 ON)
DEF
488
DEF
488
DEF
650
DEF
650
BASED ON 370 CFM/TON (SETUP SWITCH SW1---5 ON, SW4---3 ON)
DEF
558
DEF
558
DEF
744
DEF
744
Fig. 42 - - Cooling (A/C) or Continuous Fan Airflow Selection Chart
SETUP SWITCH SW2 OR SW3 POSITIONS
700
875
2
700
875
2
875
1050
2
875
1050
2
SETUP SWITCH SW2 OR SW3 POSITIONS
800
1000
2
800
1000
2
1000
1200
2
1000
1200
2
SETUP SWITCH SW2 OR SW3 POSITIONS
650
813
2
650
813
2
813
975
2
813
975
2
SETUP SWITCH SW2 OR SW3 POSITIONS
744
930
2
744
930
2
930
1116
2
930
1116
2
b. Disconnect power to furnace and remove vent connec-
tor from furnace vent elbow.
c. Restore power to furnace and set room thermostat
above room temperature.
d. After normal start- -up, allow furnace to operate for 2
minutes, then block vent elbow in furnace 80 percent
of vent area with a piece of flat sheet metal.
e. Furnace should cycle off within 2 minutes. If gas does
not shut off within 2 minutes, determine reason draft
safeguard switch did not function properly and correct
condition.
f. Remove blockage from furnace vent elbow.
g. Switch will auto- -reset when it cools.
h. Re- -install vent connector.
32
1050
1225
1400
1
1050
1225
1400
1225
1400
1750
1225
1400
1750
1200
1400
1400
1
1200
1400
1600
1400
1600
2000
1400
1600
2000
975
1138
1300
1
975
1138
1300
1138
1300
1625
1138
1300
1625
1116
1302
1400
1
1116
1302
1488
1302
1488
1860
1302
1488
1860
1400
1400
1
2100
1
2100
1
1400
1600
1
2200
1
2200
1
1300
1300
1
1950
1
1950
1
1400
1488
1
2200
1
2200
1

Advertisement

Table of Contents
loading

Table of Contents