Additional Venting Requirements; Sidewall Venting - Carrier 58CU0A Series Installation, Start-Up, Operating And Service And Maintenance Instructions

4-way multipoise, ultra low nox communicating, 80% afue gas furnace input capacities: 40,000 thru 100,000 btuh
Table of Contents

Advertisement

ADDITIONAL VENTING REQUIREMENTS

A 4" (101 mm) round vent elbow is supplied with the furnace. A
5- -inch (127 mm) or 6- - inch (152 mm) vent connector may be
required
for
some
model
4- -inch- -to- -5- -inch (101 - - 127 mm) or 4- -inch- -to- -6- -inch (101 - -
152 mm) sheet metal increaser fitting is required when 5- -inch
(127 mm) or 6- -inch (152 mm) vent connector is used. See Fig.
32 - - 35 Venting Orientation for approved vent configurations.
NOTE: Vent connector length for connector sizing starts at
furnace vent elbow. The 4- -inch vent elbow is shipped for upflow
configuration and may be rotated for other positions. Remove the
3 screws that secure vent elbow to furnace, rotate furnace vent
elbow to position desired, reinstall screws. The factory- -supplied
vent elbow does NOT count as part of the number of vent
connector elbows.
The vent connector can exit the furnace through one of two
locations on the casing.
1. Attach the single wall vent connector to the furnace vent
elbow, and fasten the vent connector to the vent elbow
with at least two field- -supplied, corrosion- -resistant, sheet
metal screws located 180_ apart.
NOTE: An accessory flue extension is available to extend from
the furnace elbow to outside the furnace casing. See Product Data
for accessory listing. If flue extension is used, fasten the flue
extension to the vent elbow with at least two field- -supplied,
corrosion- -resistant, sheet metal screws located 180_ apart. Fasten
the vent connector to the flue extension with at least two
field- -supplied, corrosion resistant sheet metal screws located
180_ apart.
2. Vent the furnace with the appropriate connector as shown
in Fig. 32 - - 35.
3. Determine the correct location of the knockout to be re-
moved.
4. Use a hammer and screwdriver to strike a sharp blow be-
tween the tie points and work the slug back and forth until
the slug breaks free.
SEE NOTES: 1,2,4,7,8,9
on the page following
these figures
Fig. 32 - - Upflow Application- -Vent Elbow Up
furnaces.
A
field- -supplied
A03208
CAUTION
!
CUT HAZARD
Failure to follow this caution may result in personal injury.
Sheet metal parts may have sharp edges or burrs. Use care
and wear appropriate protective clothing, safety glasses and
gloves when handling parts and servicing furnaces.
CAUTION
!
BURN HAZARD
Failure to follow this caution may cause personal injury.
Hot vent pipe is within reach of small children when
installed in downflow position. See the following
instruction.
An accessory Vent Guard Kit is REQUIRED for downflow
applications where the vent exits through the lower portion of the
furnace casing. See Fig. 37 and Product Data for accessory
listing. Refer to the Vent Guard Kit Instructions for complete
details.
The horizontal portion of the venting system shall slope upwards
not less than 1/4- -in. per linear ft. (21 mm/M) from the furnace to
the vent and shall be rigidly supported every 5 ft. (2 M) or less
with metal hangers or straps to ensure there is no movement after
installation.

SIDEWALL VENTING

This furnace is not approved for direct sidewall horizontal
venting.
Per section 12.4.3 of the current edition of NFPA54/ANSI
Z223.1, any listed mechanical venter may be used, when
approved by the authority having jurisdiction.
Select the listed mechanical venter to match the Btuh input of the
furnace being vented. Follow all manufacturer's installation
requirements for venting and termination included with the listed
mechanical venter.
SEE NOTES: 1,2,3,4,7,8,9
on the pages following
these figures
Fig. 33 - - Upflow Application- -Vent Elbow Right
23
A03209

Advertisement

Table of Contents
loading

Table of Contents