Download Print this page

Woodley Insight Quick Reference Manual

Electrolyte analyser
Hide thumbs Also See for Insight:

Advertisement

Quick Links

Insight Electrolyte Analyser
Quick Reference Guide

Advertisement

loading
Need help?

Need help?

Do you have a question about the Insight and is the answer not in the manual?

Questions and answers

Summary of Contents for Woodley Insight

  • Page 1 Insight Electrolyte Analyser Quick Reference Guide...
  • Page 2 Setup and Installing the Electrodes Electrode Configurations Start Up Running a Sample How to Run the Quality Control Result Review 10-14 Maintenance Shutdown Reference Ranges This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 3 Check for fill solution in the electrodes and top up if required with the enclosed fill solution (see unscheduled maintenance section, page 14). This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 4 10. Plug the tubing connector of the reference housing assembly in the receptacle below the left side of the measurement chamber. This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 5 Electrode Configurations Possible parameter configurations of the electrodes are: Electrode Position Ca/Cl/Li Dummy Dummy Dummy Dummy [Na] Dummy This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 6 5. After finishing the calibration cycle, the analyser displays “H-Ready Na-K”. Other parameters will be displayed if they are set up on the analyser. The analyser is now ready for sample analysis. This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 7: Running A Sample

    6. Wipe the probe with a lint-free tissue and close the door. 7. When analysis is complete, the results will be printed by the integrated printer. This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 8 2. If still out of limits, repeat with fresh QC 3. Contact your Woodley Account Manger or Technical support on 01204 669033 This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 9 12. “Weekly summary” will print the results from the previous 5 days. 13. “Print all” will print all data stored. This function can be interrupted by pressing „No‟. This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 10: Maintenance

    Slide the measuring chamber forward until it locks in the front position.  Unclamp the left electrode holder by moving the clamp forward. This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 11 Do not cross the tubes.  Press „No‟ until “Perform calibration” is displayed and then press „Yes‟ to initiate a calibration cycle. This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 12 Place and secure the new sample probe into the holder.  Connect the tubing of the sample probe to the sample detector. This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 13  Close the sample door and front cover.  Press „No‟ until “Perform calibration” is displayed and press „Yes‟ to start. This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 14 See diagram below  Wipe any excess fill solution from the exterior of the electrode body with a lint-free tissue. This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 15 The electrode holder remains in the forward position.  Press „Yes‟. This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 16 Turn the analyser off, unplug the power cord and close the front door.  Clean all external surfaces as well as the areas accessible through the main door and sample door. This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 17: Reference Ranges

    Kahn, C et al (Eds), Merck Veterinary Manual, 9 Ed, 2008, Merck and Co Inc. DiBartola, S P, Fluid, Electrolyte and Acid-Base Disorders, 3 Ed, 2005, Elsevier Saunders. This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 18 Clean reference electrode housing Bi-Annual Maintenance Exchange pump tubing set Annual Maintenance 1. Exchange main tubing harness 2. Replace sample probe This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 19 WEEK 5 QC tested by: NOTE: Process a QC at least once a week, compare your results with results printed on the Insight Electrolyte control data sheet. In the event of a QC failure 1. Reprocess the sample 2. If still out of limits, repeat with a fresh QC 3. Inform your Woodley Sales Representative or Woodley Equipment Company Technical Support on 01204 669033 and press option 1.
  • Page 20 Keyboard _____ Barcode reader _____ Electrodes _____ Reference electrode and housing _____ Electrode holder _____ Sample door/probe _____ Reagent pack _____ This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 21 _____ If refrigerated, remove 20 minutes before processing _____ If frozen, thaw appropriately _____ Expiry date _____ Open-vial stability time _____ This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...
  • Page 22 Signed Trainee: Name in Full: Date: This completed and signed documentation serves as a certificate of InSight Electrolyte installation and training This document is a Quick Reference Guide. For more comprehensive information please refer to the Insight Electrolytes Operators Manual...