Hydromatic S Installation And Service Manual

Hydromatic S Installation And Service Manual

Submersible solids handling pump

Advertisement

Quick Links

Installation and Service Manual
SUBMERSIBLE
SOLIDS H NDLING PUMP
Model S
NOTE! To the installer: Please make sure
you provide this manual to the owner of
the equipment or to the responsible party
who maintains the system.
For use with product
built with Regal Beloit/
Marathon motor.
11/10
Item # E-03-304-Pre
Part # 5625-304-1
© 2010 Pentair Pump Group, Inc.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Hydromatic S

  • Page 1 Installation and Service Manual SUBMERSIBLE SOLIDS H NDLING PUMP Model S NOTE! To the installer: Please make sure you provide this manual to the owner of the equipment or to the responsible party who maintains the system. For use with product built with Regal Beloit/ Marathon motor.
  • Page 2: General Information

    Hydromatic 3900 mercury switch Pump: processed from the factory. controls. The 3900 control is a The S submersible pump is mercury tube switch sealed in a supplied for 1 and 3 phase and for solid polyurethane float. The float WARNING: Before handling 200, 230, 460 or 575 volts.
  • Page 3 It is recommended that the fourth control (second override). alternator and a transformer to Hydromatic control panel be used This control also brings on the provide appropriate control for with all pumps as proper starter third pump in case of failure of control circuit and alarms.
  • Page 4: Installation Instructions

    An ohmmeter or Overload Heaters: Installing Pump in Sump: Megger can be used to check wire If the Hydromatic electrical panel Before installing pump in sump continuity. Attach one side of is not used, starters with 3 leg...
  • Page 5 Making Electrical Connections: IMPORTANT: If equipment If seal failure unit is used, connect is not properly wired and as shown with seal failure system. All electrical wiring must be in protected as recommended, the If seal failure unit is not used, the accordance with local code, and motor guarantee is void.
  • Page 6: Pump Operation

    If the pump is used on a Hydr-O- for service or repaired in an to Auto position and allow Rail system, it should be lifted authorized Hydromatic service water to rise in sump until once every six months and center. Charges will not be one pump starts.
  • Page 7 10.Replace stator housing onto transformer oil or regular wire is tagged with a metal seal chamber and bolt in place. Hydromatic submersible oil in marker giving wire number. Be sure seal failure wire this chamber. Replace plug; Cut the wires.
  • Page 8 4 bolts Use high grade transformer assembly in upright position that hold bearing cap in place. oil or Hydromatic special and bump end of shaft on Examine all O-rings for nicks submersible oil. Fill chamber hardwood block. This will before using.
  • Page 9: Pump Troubleshooting

    (gaseous) or possible 1. Pump may be air locked. Turn of liquid due to a failed level septic sump. pump off and let set for control. All Hydromatic S several minutes, then restart. submersible motors 2. Lower float control may be...
  • Page 10: Parts List

    14696-203-1 Stator 1-1/2 HP-2 HP 200/1/60 Notes: S — Parts in Seal Kit C — Parts in Carbide Seal Kit — Amount of oil required will vary between 88 and 124 oz. depending on stator size. Fill to above windings.
  • Page 11 48 26 27 28 29...
  • Page 12 Pump Notes...
  • Page 13 Pump Notes...
  • Page 14: Standard Limited Warranty

    12 months from the date of shipment from Hydromatic or 18 months from the manufacturing date, whichever occurs first - provided that such products are used compliance with the requirements of the Hydromatic catalog and technical manuals for use in pumping raw sewage, municipal wastewater or similar, abrasive free non-corrosive liquids.
  • Page 16: Start-Up Report

    Type of Junction Box: __________________________________Manufacturer of Junction Box: ______________ Are Floats Installed in Wet Well? ❑ Yes ❑ No Are Floats Set to Engineer’s Specs? ❑ Yes ❑ No Are Floats Wired for Proper Sequencing? ❑ Yes ❑ No Are Heat Sensors Hooked Up? ❑ Yes ❑ No Is the Seal Leak Detection Hooked Up? ❑...

Table of Contents