cs3K-mB-aG and cs3K-PB-aG
A
A
Use 4 clamps on the long side.
Mounting rails run perpendicular to the long side
frame.
Clamp length
≥
40 mm
A = (240 – 550) mm
Maximum Load:
≤
Uplift load
3600 Pa
≤
Downforce load
3600 Pa
Use 4 clamps on the short side.
Mounting rails run parallel to the short side frame.
Clamp length
≥
40mm
A = (230 – 270) mm
Maximum Load:
Uplift load
≤
2400 Pa
Downforce load
≤
2400 Pa
6.5
mountInG metHods foR fRamed BIfacIal
douBle Glass (sInGle-axIs tRacKeR)
· The bolts and clamps used in this section should follow
the requirements in 6.3 and 6.4.
· Under no load conditions the junction box can be in
contact with the subjacent racking structure.
A
A
Use 4 clamps on the long side.
Mounting rails run perpendicular to the long side
frame.
Clamp length
A = (270 – 380) mm
Maximum Load:
Uplift load
Downforce load
Use 4 clamps on the long side.
Mounting rails run parallel to the long side frame.
Clamp length
A = (270 – 380) mm
Maximum Load:
Uplift load
Downforce load
A
A
≥
80mm
≤
4000 Pa
≤
8100 Pa
A
A
≥
40 mm
≤
2400 Pa
≤
5400 Pa
| 19
A
A
A
A