Sp Series Gas Feed Tube Installation - Rinnai Brivis StarPro SP623UN Installation Manual

Ducted gas heater
Table of Contents

Advertisement

Table 5. Models with variable supply air O/H switch location
SP6 Models
SP623U
SP623U XA
SP630U
SP630U XA
Diagram 12. Overheat switch position and loom route
Diagram 12A:
Internal configuration from factory
A
4.3

SP SERIES GAS FEED TUBE INSTALLATION

SP4, SP5 and SP6 model heaters are supplied with a gas feed to be in the controls area beneath the lid. The gas
feed shall be installed on to the heater gas valve and tested for leaks.
For Universal heaters install the gas feed tube as follows:
a. Change the pop (duct connection) locations as required. This ensures the pre-cut blanking plate is removed from
the correct cabinet panel.
b. Remove the pre-cut blanking plate covering the hole in the upper corner of the end panel near the gas valve
assembly.
c. Position the gas feed tube from the gas valve out through the hole.
d. Install the compression fitting to the valve assembly to connect the feed tube. Do not over-tighten the compression
fitting.
Rinnai
SP5 Models
SP521U
SP521U XA
Diagram 12B:
External configuration.
Supply air fan side.
B
Diagram 12C:
External configuration.
Supply air motor side.
C
19
Ducted Gas Heater IM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents