Factory Unit Controller Settings - Lennox LCH Series Installation Instructions Manual

Gas and cooling packaged units
Hide thumbs Also See for LCH Series:
Table of Contents

Advertisement

TOP VIEW
SUPPLY
AIR
BLOWER
CONDENSER ACCESS PANEL

Factory Unit Controller Settings

Use the Unit Controller to adjust parameters; menu paths
are shown in each table. Refer to the Unit Controller
manual provided with each unit.
Tables 39 through 42 show factory settings (in degrees, %
of fan CFM, etc.). Record adjusted settings on the label
located inside the compressor access panel.
When field installing optional kits and accessories, the
Unit Controller must be configured to identify the option
before it will function. Refer to figures 38 and 39 to
determine whether the Unit Controller configuration I.D.
must change. To configure the option, use MAIN MENU >
SETUP > INSTALL menu path. Press SAVE until
CONFIGURATION ID 1 or 2 appears depending on the
option installed. Change the appropriate character in the
configuration I.D. For example, when an economizer is
installed using a single enthalpy sensor, change
configuration I.D. 1, the second character, to "S".
TABLE 39
580730
Units With BACnet Module Settings
Use menu SETUP > NETWORK INTEGRATION. Set "BACNET" and
network address.
BACNET MAC ADDRESS:
TABLE 40
580732
Units With Room Sensor, CPC/LSE Gateway Settings
Use menu SETUP > NETWORK INTEGRATION. Set "L CONNEC­
TION" and network address.
LCONN ADDRESS:
CLEAN CONDENSER COIL - UNITS WITH FIN/TUBE COILS
ENDPLATE IS SECURED
TO MULLION
CONDENSER
1-
Remove unit top panel and condenser section access
panel.
2-
Remove screws securing coil end plate to mullion.
3-
Remove wire ties connecting coils slabs and separate
slabs 3-4" (76-102mm).
4-
Clean coils with detergent or commercial coil cleaner.
5-
Rinse thoroughly with water and reassemble
field-provided wire ties to connect coil slabs.
COILS
FIGURE 37
Units With Hot Gas Reheat
Use SETTINGS > RTU OPTIONS > EDIT PARAMETERS
Para­
Factory
meter
Setting
105
6
10 sec
(-036,
-048, -060
414
All-
Aluminum
Coils only)
Units with BACnet Module (Target) Settings
Use menu SETUP > NETWORK INTEGRATION. Set "BACNET"
and network address.
BACNET MAC ADDRESS:
Para­
Factory
meter
Setting
Use SETTINGS > RTU OPTIONS > EDIT PARAMETERS
91
120
106
99
111
3
117
0
153
60
Page 70
TABLE 41
580734
Field
Setting
Description
Hot Gas Reheat Option 6: Reheat is
only possible if blower is energized
during occupied periods. Controlled
by RH sensor (A91) connected to
input A55_P298_5 and set point set
at parameter 106 (default 60%).
HI CL REHEAT TMOUT:
Number of seconds Reheat Valve
remains energized upon thermo­
stat call for high stage cooling
(default 0 seconds).
TABLE 42
580735
Setting
Description
Sets the compressor minimum run
time to 2 minutes.
Set reheat SP from connected sensor
to 99% to basically disable. Reheat
will be controlled over by BAS. Only
applies to units with the reheat option.
Thermostat with three cooling stages.
DCV max. open damper. 0=controlled
by network.
Time delay between heating and cool­
ing mode.
LGH/LCH036, 048, 060, 072, 074
.
Use

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents