Table of Contents

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .

Safety

Use of this unit as a construction heater or air conditioner
is not recommended during any phase of construction.
Very low return air temperatures, harmful vapors and
operation of the unit with clogged or misplaced filters will
damage the unit.
If this unit has been used for heating or cooling of
buildings or structures under construction, the following
conditions must be met or the warranty will be void:
S The vent hood must be installed per these installation
instructions.
S A room thermostat must control the unit. The use of
fixed jumpers that will provide continuous heating or
cooling is not allowed.
S A pre-filter must be installed at the entry to the return
air duct.
S The return air duct must be provided and sealed to
the unit.
S Return air temperature range between 55°F (13°C)
and 80°F (27°C) must be maintained.
S Air filters must be replaced and pre-filter must be
removed upon construction completion.
LGH420, 480, 540, 600
35 THROUGH 50 TONS
Page 1
Page 3
Page 3
Page 3
. . . . . . . . . . . . . .
Page 3
Page 4
Page 4
. . . . . . . . . . . . . . . . . .
Page 5
Page 6
Page 7
Page 8
INSTALLATION
INSTRUCTIONS
AGENCY REQUIRED
S The input rate and temperature rise must be set per
the unit rating plate.
S The heat exchanger, components, duct system, air
filters and evaporator coil must be thoroughly
cleaned following final construction clean-up.
S The unit operating conditions
cooling operation, ignition, input rate, temperature
rise and venting) must be verified according to these
installation instructions.
NOTE - The Commonwealth of Massachusetts
stipulates these additional requirements:
S Gas units shall be installed by a licensed plumber
or gas fitter only.
S The gas cock must be "T handle" type.
WARNING
Improper installation, adjustment, alteration, ser­
vice or maintenance can cause property damage,
personal injury or loss of life. Installation and ser­
vice must be performed by a licensed professional
HVAC installer or equivalent, service agency, or the
gas supplier
The unit is certified for installation on noncombustible
floors only. However, it may be installed on wood flooring,
or on class A, class B, or class C material covered floors
when used in downflow discharge applications when
mounted on an S1CURB10-E1 roof mounting frame.
Adequate clearance shall be provided around air
openings into the vestibule area. Provisions shall be
made for proper operation and for combustion air and
ventilation air supply. Unit must be adjusted for the
temperature rise range and within the allowable external
static pressure on furnaces with a duct system as listed on
unit nameplate.
Page 1
(including airflow,

Advertisement

Table of Contents
loading

Summary of Contents for Lennox LGH420

  • Page 1: Table Of Contents

    INSTALLATION and address. ©2017 INSTRUCTIONS AGENCY REQUIRED RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE LGH420, 480, 540, 600 PACKAGED GAS AND COOLING UNITS 506346-03 7/2017 35 THROUGH 50 TONS 506346-02 S The input rate and temperature rise must be set per Table of Contents the unit rating plate.
  • Page 2 420, 480, 540, 600 SERVICE CLEARANCES - inches (mm) NOTE - Top clearance unobstructed. É É É É É É É É É É É É É É É É É É É É É É É É É É É É É É É É É É É É É É É É Multiple Units - Vertical Airflow É...
  • Page 3: Connect Gas Piping

    Connect Gas Piping High Altitude Derate Locate the high altitude conversion sticker in the unit Two grommets are packaged with the flue exhaust and literature bag. Fill out the conversion sticker and affix next air intake hoods located in the gas heat section. to the unit nameplate.
  • Page 4: Gas Heat Operation

    TABLE 2 Gas Heat Operation MANIFOLD INPUT PRESSURES in.wg. (kPa) See the operating instruction plate on the unit for details. Natural Gas Propane (LP) Gas Unit 1st Stage 2nd Stage 1st Stage 2nd Stage + 0.2(+.05) + 0.3(+.08) + 0.2(+.05) + 0.3(+.08) Proper Gas Flow (Approximate) 420-600...
  • Page 5: Typical Gas Heat Schematic

    TYPICAL GAS HEAT SCHEMATIC This schematic is typical. See the wiring schematic on the unit for actual unit wiring. Page 5...
  • Page 6: Typical Unit Schematic

    Page 6...
  • Page 7: Repair Parts Listing

    Repair Parts Listing When ordering repair parts, include the complete model number and serial number listed on the ETL rating plate - e.g. LGH480H4BH1Y. Gas Heat Section Parts Cooling Parts Electrical Control Parts Heat Exchanger Compressors Unit Controller Combustion Air Assembly Condenser Fan Motors Compressor Contactors Combustion Air Proving Switch...
  • Page 8: Modulating Gas Valve

    MODULATING GAS VALVE (MGV) TO RIGHT HEAT SECTION RIGHT HEAT SECTION MODULATING TO LEFT HEAT GAS VALVE SECTION MANIFOLD PRESSURE PORT LEFT HEAT SECTION MODULATING RIGHT HEAT GAS VALVE SECTION GAS VALVE LEFT HEAT SECTION GAS VALVE MANIFOLD PRESSURE INLET PORT FIGURE 5 GV1 &...