System Check

Start-up Procedure:

1.
2.
3.
4.
5.
Switch the AC
Bypass breaker(s)
ON
Switch the ac power
ON at the main
utility breaker box
Switch the inverters
ON. Verify proper

operation

©1999 Trace Engineering
4
3
2
Figure 25
Power Panel Operating Controls
3.0 OPERATION
1
Switch the Battery
Disconnect(s) ON

5
Switch the Solar PV
Array Disconnect(s)
ON
23