Lamtec LT3-F Quick Reference page 28

Lambda transmitter/combination probe application only in connection with bt300/etamatic/fms/vms to co/o2-control
Table of Contents

Advertisement

6
Commissioning
6
Commissioning
Prior to commissioning, carefully read the manual and heed the instructions.
The measuring system may be operated only by trained and instructed personnel!
Improper working/operation can cause death, serious bodily injury and/or considerable mate-
rial damage.
Before commissioning, the KS1D combination probe and all alarm/signal outputs are connect-
ed, as described in Chapter 6.2 Installation in these operating instructions, to the LT3-F Lamb-
da Transmitter.
Before actuating the main switch for the voltage supply, ensure all housings (evalua-
tion electronics and terminal boxes, electrical connection of the probe) are sealed in
accordance with the instructions!
WARNING!
NOTICE
WARNING!
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ks1d

Table of Contents