Download Print this page

Eaton Aeroquip Rynglok Fitting System Installation Manual page 2

Advertisement

Rynglok Fitting System Installation Guide
1.0 Initial Preparation .................................................................................... 3
1.1 Cutting Tubes
1.2 Tube End Preparation
1.2.1 Painted Tube End Preparation
1.3 Pre-applied Tube End Marking
1.4 Marking Gauge Positioning
2.0 Fitting Installation ................................................................................... 4
2.1
Positioning Mark
2.1.1 End Fittings
3.0 Fitting Assembly ..................................................................................... 5
3.1 Assembly Tool Selection
3.1.1 Assembly Tool/Fitting Compatibility
3.2 Assembly Tool Pressure Connection
3.3 Tool Installation
3.4 Tool Pressure
3.4.1 Pressure Level
4.0 Assembled Fitting Inspection ................................................................. 6
4.1 Ring Advancement Inspection
4.1.1 Insertion Inspection Mark Position
4.2 Shared Insertion - Unions
4.2.1 Over Insertion Condition - Fittings Other Than Unions
5.0 Tubing Repair With Rynglok Unions ........................................................ 7
5.1 Single Union Repair
5.1.1 Cutting Through Center Of Defect
5.1.2 Cutting Out Defect
5.2 Two Union Repair
6.0 Special Considerations ........................................................................... 8
6.1 Using The "Reversed Tool"
6.2 Special Considerations When Using The "Reversed Tool"
6.3 Special Considerations When Using The -20 and -24 Tools
7 .0 Tube Cut Dimensions ............................................................................. 9
7 .1 Female Arcseal™ Fitting
7 .2 Female Flareless Fitting
7 .3 Female Flared Fitting
8.0 Fitting Selection Chart ........................................................................10 – 11
2
EATON Aerospace Group TF100-67A March 2013

Advertisement

loading