After Operation; After Operation Safety; Hauling - Toro 44536 Operator's Manual

Debris blower, serial no. 403063078 and up
Hide thumbs Also See for 44536:
Table of Contents

Advertisement

After Operation

After Operation Safety

General Safety
Park the machine on a firm, level surface; shut off
the traction unit engine, remove the key, wait for
all moving parts to stop, and allow the machine
to cool before adjusting, repairing, cleaning, or
storing the machine.
Only disconnect the machine from the traction unit
while on a level surface.
When disconnecting the machine, always chock
the wheels to prevent movement.
Keep all parts of the machine in good working
condition and all hardware tightened.
Replace all worn, damaged, or missing decals.

Hauling

Use care when loading or unloading the machine
into a trailer or truck.
Use full-width ramps for loading machine into
trailer or truck.
Tie the machine down securely using straps,
chains, cable, or ropes. Direct both the front and
rear straps down and outward from the machine.
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

600

Table of Contents