Electrical Installation -- Europe

230 Volt Electrical Installation
All 230V spas must be permanently connected (hard
wired) to the power supply. These instructions describe
the only acceptable electrical wiring procedure. Spas
wired in any other way will void your warranty and may
result in serious injury.
This the only acceptable electrical wiring procedure.
Spas wired in any other way will void your warranty. See
the wiring diagram on page 10.
The electrical wiring of this spa must meet the
requirements of any applicable local, state, and federal
codes. The electrical circuit must be installed by an
electrical contractor and approved by a local building /
electrical inspector.
RCD and Wiring Requirements
The power supplied to the spa must be on a dedicated
RCD protected circuit with no other appliances or lights
sharing the power.
Use copper wire with THHN insulation. Do not use
aluminum wire.
Use the table below to determine your GFCI and wiring
requirements.
Spa Model
Designer in-ground spas with one 3
kW heater
Designer in-ground spa with one 3
kW heater and one 5.5 kW heater
2008 Inground Spa Owner's Manual
LTR20081002, Rev. A
Preparing for Your New Inground Spa
When wires larger than #6 AWG are required, install a
junction box near the spa and use #6 AWG wire between
the junction box and the spa.
Wire runs over 85 feet must increase wire gauge to the
next lower number. For example: A normal 50 amp RCD
with four #8 AWG copper wires run over 85 feet would
require you to go to four #6 AWG copper wires.
Testing the RCD Breaker
Test the RCD breaker prior to first use and periodically
when the spa is powered. To test the RCD breaker follow
these instructions (spa should be operating):
1.
2.
GFCI Required
One 32 amp RCD or two 16 amp
RCDs
Service 1: One 32 amp RCD or two 16
amp RCDs
Service 2: One 32 amp RCD or two 16
amp RCDs
Press the TEST button on the RCD. The RCD will
trip and the spa will shut off.
Reset the RCD breaker by switching the breaker
to the full OFF position, wait a moment, then turn
the breaker back on. The spa should have power
again.
Four #10 AWG copper wires
Service 1: Four #10 AWG copper
wires
Service 2: Three #10 AWG copper
wires
Wires Required