Head Load Solenoid And Bail; Solenoid And Bail Service Check - IBM 5280 Maintenance Information Manual

Distributed data system, maintenance diskette drive
Hide thumbs Also See for 5280:
Table of Contents

Advertisement

Head Load Solenoid and Bail
343
SOLENOID AND BAI L SERVICE CHECK
1.
Power off.
2.
3.
4.
5.
DANGER
Capacitor discharge voltage might be present at the
socket when the AC drive motor power cable is
disconnected.
Disconnect the AC drive motor power cable
D.
I nsert a diskette into the diskette drive and close
the diskette locking lever
D.
Power on.
Install a jumper from
fJ
(ground) to
II
(-head
load).
18
Head Load Solenoid and Bail
343
6.
7.
8.
Install a jumper from
0
(ground) to Q(-disable
stepper motor).
Visually check for a 0.3 to 0.7 millimeter (0.012 to
0.028 inch) gap
m
between the bail
II
and the head
load arm
II
for all of the carriage travel (track 00
through track 76).
If the gap is within the limits, proceed with step 9.
If the gap is not within the limits, go to 346, step 7.
9.
Remove the jumpers installed in steps 5 and 6.
10.
Open the diskette locking lever and remove the
diskette.
11.
Close the diskette locking lever.
12.
Power off.
13.
Reconnect the AC drive motor power cable.
14.
Power on.

Advertisement

Table of Contents
loading

Table of Contents