Installation And Initial Configuration - Vemer TUO GSM VE771800 User Manual

Digital chronothermostat
Table of Contents

Advertisement

INSTALLATION AND INITIAL CONFIGURATION

Device installation
The device can be installed on the wall or to cover the 3-module flush-mounting box
(type 503).
We recommend positioning at a height of 1.5 meters from the floor, in an area that
respects as much as possible the average temperature conditions of the entire
environment. Make sure the area is covered by the GSM signal to guarantee
a stable communication. In this regard, the device allows verifying the intensity of the
signal of each operator (see page 47).
Avoid installation near doors or windows, in niches, behind doors and curtains or
in positions with excess or total lack of ventilation, to avoid that the reading of the
temperature measured by the probe is in some way offset.
1
3
5
2
4
6
p u s h -p u s h
- 46 -
TUO GSM Chronothermostat User Manual
1
1
2
click

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tuo gsm ve771900

Table of Contents