Rtu Open Control System; Sensory/Accessory Installation - Carrier 48GC04 Service And Maintenance Instructions

Single package rooftop gas heat/electric cooling unit with puron (r-410a) refrigerant 3 to 5 nominal tons
Table of Contents

Advertisement

RTU OPEN CONTROL SYSTEM

The RTU Open controller is an integrated component of the
Carrier rooftop unit. Its internal application programming pro-
vides optimum performance and energy efficiency. RTU Open
enables the unit to run in 100% stand-alone control mode, Car-
rier's i-Vu
Open network, or a Third Party Building Automa-
®
tion System (BAS). On-board DIP switches allow the user to
select your protocol (and baud rate) of choice among the four
most popular protocols in use today: BACnet, Modbus
son N2 and LonWorks
2
. See Fig. 60.
The RTU Open control is factory-mounted in the unit's main
control box, to the left of the UCB (unit control board). Factory
wiring is completed through harnesses connected to the UCB.
Field connections for RTU Open sensors will be made at the
PCB connectors on the RTU Open board. The factory-installed
RTU Open control includes the supply-air temperature (SAT)
sensor. The outdoor air temperature (OAT) sensor is included
in the FIOP/accessory EconoMi$er
1. LonWorks is a registered trademark of Echelon Corporation.
2. Modbus is a registered trademark of Schneider Electric.
3-Volt
Lithium
Battery
LonWorks
Option Card
Port
J15
Example set for
BACnet MS/TP
and 76.8K baud
(1, 2, and 4 ON)
Recommended for all
i-Vu Open installations
1
, John-
®
2 package.
J4
BO-1
J12
Protocol Selector
*Remove
both for 0-5V
Fig. 60 — RTU Open Control Module

Sensory/Accessory Installation

There are a variety of sensors and accessories available for the
RTU Open. Some of these can be factory or field installed,
while others are only field installable. The RTU Open control-
ler may also require connection to a building network system
or building zoning system. All field control wiring that con-
nects to the RTU Open must be routed through the raceway
built into the corner post of the unit or secured to the unit con-
trol box with electrical conduit. The unit raceway provides the
UL required clearance between high and low-voltage wiring.
Pass the control wires through the hole provided in the corner
post, then feed the wires thorough the raceway to the RTU
Open. Connect the wires to the removable PCB connectors and
then reconnect the connectors to the board.
IMPORTANT: Refer to the specific sensor or accessory
instructions for its proper installation and for rooftop unit
installation refer to base unit installation instructions and the
unit's wiring diagrams.
Board Power
J1
BO-2
BO-3
BO-4
J22
AO-2
GND
(2-10V)
J13
J17
J19
J20
SPT (temp input)
SPT (common)
SPT (offset input)
37
(AO-1)
0-10VDC
J3
J2
4-20mA
J5
BO-5
J22
VAF Output
BO-6
J11
BO-6
BO-7
(H) Humidimizer
BO-8
BO-8
(Power Exhaust)
Network Comm
J14
BACnet, Modbus, or N2
(LON connection J15)
J5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

48gc06

Table of Contents