Baltimore Aircoil Company Trillium Series Operating And Maintenance Instructions Manual page 26

Adiabatic cooler
Table of Contents

Advertisement

12. Tighten the sleeve clamps to secure the water feed assembly in place.
13. Connect the flexible pipe to the city water supply. Use the "pad maintenance" switch to open the city water
valve. Check the collector for any holes that remain clogged. If some holes are still clogged, repeat the
procedure.
14. Place the pre-cooling media back in the pre-cooler section. Refer to section "Adiabatic pre-cooling media" on
the facing page.
26
W W W . B A L T I M O R E A I R C O I L . E U
Waterfeed assembly
Flexible sleeve connection with sleeve clamps

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents