9. First put the collector through the hole of the side gable. Note that this is the opposite side of the alignment
hole.
10. Use the mark you made on the collector to locate the correct position of the alignment hole. Push the collector
upward to clamp it securely into the plastic holders.
11. Reposition the water feed assembly. Note that it should go +/- 30 mm inside the rubber tube.
6 Maintenance procedure
6 Maintenance procedure
Plastic clip with longer screw
Installation of copper waterfeed pipe
Alignment of waterfeed pipe
W W W . B A L T I M O R E A I R C O I L . E U
25