CATEGORY IV FIGURE 5 OR FIGURE 6 (VENT PIPE
PROPANE GAS . . . . . . . . . . . . . . . . . . . . . . . . 24
MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . 30
REPAIR PARTS . . . . . . . . . . . . . . . . . . . . . . . . 33
FTXLF-IOM-HN-1-110308 Copyright 2008 Mestek, Inc.
Finned copper tube gas boilers & water heaters - Boiler manual
BeFore yoU stArt
This manual covers the application, installation, operation and main-
tenance of a Futera XLF Series finned copper heating boiler/water
heater.
To obtain the safe, dependable, efficient operation and long life for
which this heating boiler/water heater was designed, these instruc-
tions must be read, understood and followed.
The Futera XLF Series finned copper heating boiler/water heaters
have been design certified by CSA for use with natural and propane
gas under the latest revision of ANSI Z21.10.3/CSA 4.3, Gas Wa-
ter Heaters, ANSI-Z21.13/CSA 4.9, Gas-Fired Low Pressure Steam
and Hot Water Boilers and CAN 1-3.1, Industrial and Commercial
Gas Fired Packaged Boilers. Each unit has been constructed and
hydrostatically tested for a maximum working pressure of 160 psi,
1103 kPa in accordance with Section IV of the ASME Boiler and
Pressure Vessel Code.
All aspects of the boiler/water heater installation must conform to
the requirements of the authority having jurisdiction, or, in the ab-
sence of such requirements, to the National Fuel Gas Code, ANSI
Z223.1/NFPA 54-latest revision. Where required by the authority
having jurisdiction, the installation must conform to the Standard for
Controls and Safety Devices for Automatically Fired Boilers, ANSI/
ASME CSD-1.
In Canada, the installation must be in accordance with the require-
ments of CSA B149.1 or .2, Installation Code for Gas Burning Ap-
pliances and Equipment.
If installed in the Commonwealth of Massachusetts, you MUST
FOLLOW the additional instructions contained in RBI's instruc-
tion sheet, MACODE-3, located in the back of this manual.
The owner should maintain a record of all service work per-
formed with the date and a description of the work done.
Include the name of the service organization for future reference.
Direct all questions to your RBI distributor or contact the
RBI Customer Service Department at:
Always include the model and serial numbers from the rating plate
of the boiler/water heater in question.
U. S. -
260 North Elm Street
Westfield, MA 01085
Canada -
7555 Tranmere Drive
Mississauga ONT L5S 1L4
3