RBI Futera Fusion FTF-PVCVO-2 Installation Instructions Manual

RBI Futera Fusion FTF-PVCVO-2 Installation Instructions Manual

Condensing finned copper gas boilers (cb) & water heaters (cw)

Advertisement

Th is manual is intended only for use by a qualifi ed heating installer/technician. Read and follow this manual, all supplements and related
instructional information provided with the boiler. Install, start and service the boiler only in the sequence and methods given in these
instructions. Failure to do so can result in severe personal injury, death or substantial property damage.
Do not use the boiler during construction.
the burner, resulting in possible severe personal injury, death or substantial property damage. Th e boiler can only be operated with a dust-
free air supply. Follow the instruction manual procedures to duct air to the boiler air intake. If the boiler has been contaminated by operation
with contaminated air, follow the instruction manual guidelines to clean, repair or replace the boiler if necessary.
Affi x these instructions near to the boiler. Instruct the building owner to retain the instructions for future use by a qualifi ed service technician,
and to follow all guidelines in the User' s Information Manual.
Condensing
Finned Copper
Gas Boilers (CB) &
Water Heaters (CW)
Optional PVC
Vent System

Installation instructions

Supplement
Also read and follow:
Futera Fusion installation
and operation manual
Construction dust and particulate, particularly drywall dust, will cause contamination of
FTF-PVCVO-2
82-0340
03/13 Copyright 2008 Mestek, Inc.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Futera Fusion FTF-PVCVO-2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for RBI Futera Fusion FTF-PVCVO-2

  • Page 1: Installation Instructions

    FTF-PVCVO-2 82-0340 Condensing Finned Copper Gas Boilers (CB) & Water Heaters (CW) Optional PVC Vent System Installation instructions Supplement Also read and follow: Futera Fusion installation and operation manual Th is manual is intended only for use by a qualifi ed heating installer/technician. Read and follow this manual, all supplements and related instructional information provided with the boiler.
  • Page 2 Th ese instructions are specifi c to using schedule 40 PVC pipe as the Figure 1 PVC Vent Horizontal Adaptor vent system for the RBI Fusion. Th e instructions contained in the Fusion Installation and Operation Manual, including all applicable Combustion Air & Ventilation and Venting instructions must be followed.
  • Page 3 Optional PVC vent system installation instructions supplement PVC VENT ADAPTOR INSTALLATION Figure 2 PVC Vent Vertical Adaptor Improper installation of the PVC vent adaptor can cause pooling of corrosive condensate and result in premature failure of the vent adaptor voiding the manufacturer’...
  • Page 4 Optional PVC vent system installation instructions supplement PVC VENT SYSTEM INSTALLATION Figure 3 PVC Vent Adaptor Installation Never insulate or encapsulate the PVC vent system or overheating and failure of the vent system may occur. Th e PVC vent system must be exposed to ambient air and readily visible for inspection.
  • Page 5 Optional PVC vent system installation instructions supplement Primers, cleaners and cements are extremely fl ammable PVC VENT PIPE PREPARATION and harmful or fatal if swallowed. Always store primers, & ASSEMBLY cleaners and cements in a cool, dry, well ventilated place. Do not store them near heat, sparks or fl ames. Only schedule 40 PVC pipe sized per Table 1 is to be used.
  • Page 6 Optional PVC vent system installation instructions supplement PVC VENT TERMINALS Figure 6 Horizontal PVC 90° Elbow Terminal When vented horizontally the vent and air intake systems may be terminated using standard PVC fi tt ings with 1/4 in stainless steel bird-screen inserts as shown below.
  • Page 7 Optional PVC vent system installation instructions supplement Table 1 Turn Down vs Combustion Air Source Figure 8 Vertical PVC Terminal Terminal Type Combustion Air Turn Down Ratio Indoor Outdoor Indoor 1/4'' SS Bird Screen 45° Elbow Outdoor In Opening Indoor 90°...
  • Page 8 260 North Elm Street 7555 Tranmere Drive Westfi eld, MA 01085 Mississauga, Ontario L5S 1L4 Canada Phone: (413) 568-9571 Phone: (905) 670-5888 Fax: (413) 568-9613 Fax: (905) 670-5782 www.rbiwaterheaters.com Copyright 2008 Mestek, Inc.

Table of Contents