Commissioning

Commissioning begins with connecting and downloading the hardware. Next, carry out the
connection and function test. Finally, the system is optimized. Values have to be simulated for
some tasks.
Information which supports you in these tasks is available found below.
Additional information
Refer to the device-specific documentation for information on connecting the FF devices.